Ordering water and sewage management along with rainwater drainage in the Chojnice Agglomeration – stage II (Q85504)

From EU Knowledge Graph
Revision as of 20:58, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif principal du projet «Organisation de gestion de l’eau et des eaux usées avec drainage pluvial dans la zone d’agglomération de Chojnice — phase II» est d’augmenter la population grâce au système amélioré de traitement des eaux usées dans l’agglomération de Chojnice, dans les localités situées sur son territoire: Charzykowy et Ciechocin. Cet objectif sera atteint par les étapes suivantes: — augmentation de la longueur du réseau d’assain...)
Jump to navigation Jump to search
Project Q85504 in Poland
Language Label Description Also known as
English
Ordering water and sewage management along with rainwater drainage in the Chojnice Agglomeration – stage II
Project Q85504 in Poland

    Statements

    0 references
    12,820,837.09 zloty
    0 references
    3,077,000.90 Euro
    13 January 2020
    0 references
    15,083,337.76 zloty
    0 references
    3,620,001.06 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2017
    0 references
    28 February 2021
    0 references
    GMINNY ZAKŁAD GOSPODARKI KOMUNALNEJ SP. Z O.O. W CHOJNICACH
    0 references
    0 references
    0 references

    53°41'59.6"N, 17°34'13.4"E
    0 references
    Głównym celem projektu „Uporządkowanie gospodarki wodno-ściekowej wraz z kanalizacją deszczową na terenie Aglomeracji Chojnice – etap II” jest zwiększenie liczby ludności korzystającej z ulepszonego systemu oczyszczania ścieków w Aglomeracji Chojnice, w miejscowościach położonych na jej terenie: Charzykowy i Ciechocin. Cel ten osiągnięty zostanie poprzez następujące cele pośrednie: - zwiększenie długości sieci kanalizacji sanitarnej w aglomeracji (ok. 7,12 km), co pozwoli na przyłączenie obecnych mieszkańców i stworzy możliwości przyłączenia w kolejnych latach nowych terenów przeznaczonych pod zabudowę mieszkaniową, - likwidacja nieszczelnych zbiorników bezodpływowych (21 szt.) -modernizacja starej i wyeksploatowanej infrastruktury i zmniejszenie jej awaryjności (2,6 km), - budowę kanalizacji deszczowej- (2,3km) - wprowadzenie systemu zarządzania siecią typu GIS, - zakup i wykorzystanie na etapie eksploatacji specjalistycznych samochodów, które pozwolą na prawidłowe wykorzystanie i zabezpieczenie infrastruktury, - osiągnięcia celów dyrektywy ściekowej, które ujęte zostały w II priorytecie Aktualizacji Master Planu dla wdrożenia dyrektywy 91/271/EWG (dyrektywa ściekowa), Przedmiotowy projekt pozwoli na przyłączenie do zbiorczego systemu odprowadzania ścieków 250 RLM (Polish)
    0 references
    The main objective of the project “Organising water and sewage management together with rainwater drainage in the Chojnice Agglomeration – Stage II” is to increase the number of people benefiting from an improved sewage treatment system in the Chojnice Agglomeration, in towns located in its area: Charsy and Ciechocin. This objective will be achieved through the following intermediate objectives: — increasing the length of sanitary sewage system in the agglomeration (approx. 7.12 km), which will allow the connection of the current residents and create the possibility of connecting new areas for housing in the following years, – liquidation of leaky waste water tanks (21 pieces) – modernisation of the old and exhausted infrastructure and reduction of its failure (2.6 km), – construction of rainwater drainage systems- (2.3 km) – introduction of a system of management of the GIS type, – purchase and use of specialised cars, which allow for the achievement of the objectives of the Master of the Priority of the Directive- (2.3 km) – introduction of a system of management of the GIS type, – purchase and use of specialised cars, which allow for the achievement of proper use and protection of infrastructure, (English)
    14 October 2020
    0 references
    L’objectif principal du projet «Organisation de gestion de l’eau et des eaux usées avec drainage pluvial dans la zone d’agglomération de Chojnice — phase II» est d’augmenter la population grâce au système amélioré de traitement des eaux usées dans l’agglomération de Chojnice, dans les localités situées sur son territoire: Charzykowy et Ciechocin. Cet objectif sera atteint par les étapes suivantes: — augmentation de la longueur du réseau d’assainissement dans l’agglomération (env. 7,12 km), ce qui permettra le raccordement des résidents actuels et créera des possibilités de relier de nouvelles zones de logement dans les années suivantes, — le démantèlement des réservoirs sans fuites (21 unités) — la modernisation des infrastructures anciennes et épuisées et la réduction de leur défaillance (2,6 km), — la construction d’eaux de pluie — (2,3 km) — l’introduction d’un système de gestion du réseau SIG, — l’achat et l’utilisation, au stade de l’exploitation de véhicules spécialisés, qui permettront l’utilisation et la protection appropriées des infrastructures — afin d’atteindre les objectifs de la directive sur les eaux usées, qui figurent dans la deuxième priorité de la mise à jour du plan directeur pour la mise en œuvre de la directive 91/271/CEE (directive sur les eaux résiduaires), ce projet permettra le raccordement de 250 EH au système collectif de collecte des eaux résiduaires (French)
    30 November 2021
    0 references

    Identifiers

    POIS.02.03.00-00-0321/17
    0 references