Ordering water and sewage management for the protection of water resources in Poznań and its surroundings – Stage VI (Q85254)

From EU Knowledge Graph
Revision as of 16:34, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Investissements prévus dans le cadre du projet: Modernisation de SUW «Wiśniowa» à Poznań (installation de pompes à puits dans les puits en vrac nos 1 et 2, modernisation des installations existantes et construction de nouvelles installations technologiques.) Optimisation des travaux de jonction des sédiments à la Coś (assemblage de 2 dispositifs pour l’optimisation du processus de floculation) Gestion de l’énergie à la Coś (construction d’un nou...)
Jump to navigation Jump to search
Project Q85254 in Poland
Language Label Description Also known as
English
Ordering water and sewage management for the protection of water resources in Poznań and its surroundings – Stage VI
Project Q85254 in Poland

    Statements

    0 references
    241,201,047.18 zloty
    0 references
    57,888,251.32 Euro
    13 January 2020
    0 references
    283,765,937.86 zloty
    0 references
    68,103,825.09 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    AQUANET SPÓŁKA AKCYJNA
    0 references
    0 references
    0 references
    Planowane inwestycje w ramach Projektu: Modernizacja SUW „Wiśniowa” w Poznaniu (zainstalowanie pomp wałowych w studni zbiorczej nr 1 i nr 2, modernizacja istniejących obiektów oraz budowa nowych obiektów technolog.) Optymalizacja pracy węzła osadowego w COŚ (montaż 2 urządzeń do optymalizacji procesu flokulacji) Zarządzania energią na COŚ (budowa nowego GPZ, budowa elektrowni fotowoltaicznej, montaż instalacji wytwarzającej energię elektryczną przy wykorzystaniu turbiny parowej ORC) Modernizacja układu cieplnego na Centralnej Oczyszczalni Ścieków w Koziegłowach (kotłownia opalana zamiennie gazem ziemnym i biogazem - źródło ciepła dla potrzeb c.o., c.w.u., wentylacji i celów technologicznych obiektów COŚ) Modernizacja wybranych obiektów COŚ w Koziegłowach (modernizacja piaskowników, renowacja kanalizacji wewnętrznej o łącznej długości 1261,8 m, modernizacja układu napowietrzania bioreaktorów) Modernizacja LOŚ w Poznaniu (dostawa i montaż dmuchaw powietrza) Budowa kanalizacji sanitarnej (grawitacyjnej i ciśnieniowej) o łącznej długości 126 km Budowa sieci wodociągowej o łącznej długości 2,7 km Renowacja kanalizacji sanitarnej (kolektora Prawobrzeżnego I w Poznaniu) metodą bezwykopową w aglomeracji Poznań o łącznej długości 6,69 km Inteligentny system zarządzania (adaptacja budynku Pompowni Wody Czystej na cele centralnej dyspozytorni; budowa komputerowego systemu nadzoru dla Poznańskiego Systemu Kanalizacyjnego (PSK); model matematyczny sieci kanalizacyjnej i rozbudowa punktów pomiarowych na PSK; rozbudowa systemu cyfrowej archiwizacji dokumentów - Etap II) Podłączonych do sieci kanalizacji sanitarnej zostanie 10 207 RLM, do sieci wodociągowej - 66 Mk. Budowa kanalizacji przyczyni się do zmniejszenia niedoboru infrastruktury sieciowej w agl. Poznań. Procent wyposażenia aglomeracji przed realizacją projektu to 98,4% natomiast po realizacji projektu będzie wynosił ok. 99,3%. (Polish)
    0 references
    Planned investments within the Project: The modernisation of the length of the internal system of the “Church” in Poznań (installation of shaft pumps in the aggregate well no. 2, modernisation of existing objects and construction of new technological objects.) Optimisation of work of sediment node in COŚ (a montage of 2 devices to optimise the process of floculation) Energy management on COŚ (construction of new GPZ, construction of photovoltaic power plant, installation of electrical energy using ORC steam turbine) Modernisation of the thermal system on Cosmos. construction of a computer surveillance system for the Poznań Canal System (PSK); mathematical model of sewage network and extension of measuring points on PSK; expansion of digital document archiving system – Stage II) connected to the sanitary sewer system will be 10 207 RLM, to the water supply network – 66 Mk. The construction of the sewer system will reduce the shortage of network infrastructure in AGL. It’s Poznań. The percentage of equipment of the agglomerations before the project is 98.4 % while after the project will be approx. IT’S 99.3 %. (English)
    14 October 2020
    0 references
    Investissements prévus dans le cadre du projet: Modernisation de SUW «Wiśniowa» à Poznań (installation de pompes à puits dans les puits en vrac nos 1 et 2, modernisation des installations existantes et construction de nouvelles installations technologiques.) Optimisation des travaux de jonction des sédiments à la Coś (assemblage de 2 dispositifs pour l’optimisation du processus de floculation) Gestion de l’énergie à la Coś (construction d’un nouveau GPZ, construction d’une centrale photovoltaïque, installation d’une installation de production d’électricité à l’aide d’une turbine à vapeur ORC) Modernisation du système thermique de l’usine centrale de traitement des eaux usées de Koziegłowy modernisation de certains objets Coś (modernisation des bacs à sable, rénovation des systèmes d’égouts internes d’une longueur totale de 1 261,8 m, modernisation du système d’aération des bioréacteurs) Modernisation de la LOŚ à Poznań (fourniture et assemblage de souffleurs d’air) Construction d’un système d’égout sanitaire (gravité et pression) avec un longueur totale de 126 km Construction d’un réseau d’approvisionnement en eau d’une longueur totale de 2,7 km Rénovation du système d’assainissement sanitaire (capteur côtier droit I à Poznań) par méthode sans tranchées dans l’agglomération de Poznań avec une longueur totale de 6,69 km Système de gestion intelligente (adaptation de la construction de l’usine de pompage d’eau propre aux fins de la station centrale d’expédition; construction d’un système de surveillance informatique pour le système d’assainissement de Poznań (PSK); modèle mathématique du réseau d’assainissement et extension des points de mesure à PSK; extension du système d’archivage numérique des documents — Phase II) 10 207 EH seront connectés au réseau d’assainissement, 66 Mk au réseau d’approvisionnement en eau. La construction du réseau d’assainissement contribuera à réduire la pénurie d’infrastructures de réseau dans l’AGL. Poznań. Le pourcentage d’équipements d’agglomération avant la mise en œuvre du projet est de 98,4 %, alors qu’après la mise en œuvre du projet, il sera d’environ. 99,3 %. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.02.03.00-00-0054/17
    0 references
    4920
    0 references