Removal of Fibrocement in School Buildings — Basic School No. 2 of Taveiro (Q3357343)

From EU Knowledge Graph
Revision as of 15:07, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The present operation materialises in an intervention to remove the asbestos cement tiles. It is intended to replace all asbestos-cement components, with the possibility of having asbestos (cancer-gene material), with panels of profiled sheet covering., translated_summary)
Jump to navigation Jump to search
Project Q3357343 in Portugal
Language Label Description Also known as
English
Removal of Fibrocement in School Buildings — Basic School No. 2 of Taveiro
Project Q3357343 in Portugal

    Statements

    0 references
    100,508.0 Euro
    0 references
    100,508.0 Euro
    0 references
    100.0 percent
    0 references
    17 December 2020
    0 references
    31 July 2021
    0 references
    MUNICÍPIO DE COIMBRA
    0 references
    A presente operação materializa-se numa intervenção para remover as telhas de fibrocimento. Pretende-se substituir todos os elementos em fibrocimento, com a possibilidade de terem amianto (material cancerígeno), por painéis de cobertura de chapa perfilada. (Portuguese)
    0 references
    The present operation materialises in an intervention to remove the asbestos cement tiles. It is intended to replace all asbestos-cement components, with the possibility of having asbestos (cancer-gene material), with panels of profiled sheet covering. (English)
    29 November 2021
    0 references
    Coimbra, Região de Coimbra, Centro
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000248
    0 references