Removal of asbestos cement cover in the Basic and Secondary School Father José Augusto da Fonseca, Aguiar da Beira (Q3357309)

From EU Knowledge Graph
Revision as of 15:04, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Removal from asbestos cement cover in the Basic and Secondary School Father José Augusto da Fonseca, Aguiar da Beira, with about 2 820.00 m² and its replacement with a sandwich panel cover., translated_summary)
Jump to navigation Jump to search
Project Q3357309 in Portugal
Language Label Description Also known as
English
Removal of asbestos cement cover in the Basic and Secondary School Father José Augusto da Fonseca, Aguiar da Beira
Project Q3357309 in Portugal

    Statements

    0 references
    152,319.0 Euro
    0 references
    152,319.0 Euro
    0 references
    100.0 percent
    0 references
    26 August 2020
    0 references
    16 April 2021
    0 references
    MUNICÍPIO DE AGUIAR DA BEIRA
    0 references
    Remoção de uma cobertura de fibrocimento com amianto na Escola Básica e Secundária Padre José Augusto da Fonseca, Aguiar da Beira, com cerca de 2820,00 m2 e sua substituição por uma cobertura em painel sanduíche. (Portuguese)
    0 references
    Removal from asbestos cement cover in the Basic and Secondary School Father José Augusto da Fonseca, Aguiar da Beira, with about 2 820.00 m² and its replacement with a sandwich panel cover. (English)
    29 November 2021
    0 references
    Aguiar da Beira, Viseu Dão Lafões, Centro
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000218
    0 references