Energy renovation of the Suchfield Building of the State of Health at the address at Kraja Zvolira 2 in Suhopolje Municipality of Suhopolje (Q2733410)

From EU Knowledge Graph
Revision as of 19:47, 29 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q2733410 in Croatia
Language Label Description Also known as
English
Energy renovation of the Suchfield Building of the State of Health at the address at Kraja Zvolira 2 in Suhopolje Municipality of Suhopolje
Project Q2733410 in Croatia

    Statements

    0 references
    656,702.82 Croatian kuna
    0 references
    85,371.37 Euro
    2 June 2021
    0 references
    1,074,984.15 Croatian kuna
    0 references
    139,747.94 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    1 April 2019
    0 references
    1 April 2021
    0 references
    DOM ZDRAVLJA VIROVITIČKO-PODRAVSKE ŽUPANIJE
    0 references
    0 references

    45°49'53.94"N, 17°23'7.94"E
    0 references
    33000
    0 references
    Projektom je planirana energetska obnova zgrade 1 koja obuhvaća četiri građevinske mjere za poboljšanje toplinske zaštitne ovojnice (zidovi na pročelju zgrade, strop prema tavanu, strop- kosi strop, te zamjenu vanjske stolarije). Projektom je planirana energetska obnova zgrade 2 koja obuhvaća tri građevinske mjere za poboljšanje toplinske zaštitne ovojnice ( zidove na pročelju zgrade, strop prema tavanu i zamjena vanjske stolarije). Projektom je predviđena jedna elektrotehnička mjera za obje zgrade ( zamjena rasvjetnih tijela), te dvije strojarske mjere ( ugradnja kondenzacijskih plinskih bojlera i ugradnja termostatskih ventila) a sve u cilju smanjenja utroška energije i štetnih emisija CO2. (Croatian)
    0 references
    The project planned energy renovation of a building 1, which includes four building measures to improve the thermal protective envelope (walls on the front side of the building, ceiling to the attic, ceiling — conflict ceiling, and external joinery replacement). The project planned energy renovation of a building 2, which includes three building measures to improve the thermal protective envelope (building on the front side of the building, ceiling to attic and external joinery replacement). The project foresees one electronic technical measure for both buildings (replacement of luminaires), as well as two engine engineering measures (installation of condensing boilers and thermostatic installation), with a view to reducing energy input and harmful CO2 emissions. (English)
    3 June 2021
    0 references
    Le projet prévoyait la rénovation énergétique du bâtiment 1 comprenant quatre mesures d’amélioration de l’enveloppe de protection thermique (murs sur la façade du bâtiment, plafond vers le grenier, plafond en pente de plafond et remplacement des menuiseries extérieures). Le projet prévoyait la rénovation énergétique du bâtiment 2 comprenant trois mesures d’amélioration de l’enveloppe de protection thermique (murs sur la façade du bâtiment, plafond vers le grenier et remplacement des menuiseries extérieures). Le projet prévoit une mesure électrotechnique pour les deux bâtiments (remplacement des luminaires) et deux mesures mécaniques (installation de chaudières à gaz de condensation et installation de vannes thermostatiques) toutes afin de réduire la consommation d’énergie et les émissions nocives de CO2. (French)
    29 November 2021
    0 references

    Identifiers

    KK.04.2.1.04.0754
    0 references