Extension of plant – production hall extension (Q3060984)

From EU Knowledge Graph
Revision as of 14:30, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): Für eine verbesserte Bearbeitung des Geschäftsfeldes "Wasserkraft" mit dem Produkt "Durchströmturbine" plant das Unternehmen die Errichtung eines Produktionshallenzubaus und die maschinelle Ausstattung desselben., Removing bad summary)
Jump to navigation Jump to search
Project Q3060984 in Austria
Language Label Description Also known as
English
Extension of plant – production hall extension
Project Q3060984 in Austria

    Statements

    0 references
    879,352.22 Euro
    0 references
    2 February 2017
    0 references
    30 September 2019
    0 references
    Mayrhofer Gesellschaft m.b.H.
    0 references
    0 references

    47°25'32.84"N, 15°47'11.18"E
    0 references
    62262
    0 references
    For an improved processing of the hydropower business area with the product “through-flow turbine”, the company plans to build a production hall building and to equip it with the machine. (English)
    20 July 2021
    0 references
    Afin d’améliorer le traitement de l’activité «hydroélectricité» avec le produit «turbine à flux continu», l’entreprise prévoit la construction d’un atelier de production et l’équipement mécanique de celui-ci. (French)
    27 November 2021
    0 references
    Om de verwerking van de waterkrachtsector met het product „doorvoerturbine” te verbeteren, is het bedrijf van plan om een productiehal te bouwen en deze per machine uit te rusten. (Dutch)
    29 November 2021
    0 references
    Wenigzell
    0 references

    Identifiers

    AUST-696
    0 references