Hardwood glued wood panels production (Q3061223)

From EU Knowledge Graph
Revision as of 14:51, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): Projektgegenstand ist die Errichtung einer modernen Fertigungsstätte für 1-schichtige Massivholzplatten. Neben einer baulichen Adaptierung der Halle kommt es zu maschinellen Investitionen inkl. BGA, Werkzeugen, Trockenkammern und Absaugtechnik., Removing bad summary)
Jump to navigation Jump to search
Project Q3061223 in Austria
Language Label Description Also known as
English
Hardwood glued wood panels production
Project Q3061223 in Austria

    Statements

    0 references
    5,741,118.2 Euro
    0 references
    2 June 2017
    0 references
    30 June 2019
    0 references
    WIBEBA-HOLZ Gesellschaft m.b.H.
    0 references
    0 references
    46°59'17.52"N, 16°15'36.54"E
    0 references
    10503
    0 references
    The object of the project is the construction of a modern production facility for 1-layer solid wood panels. In addition to a structural adaptation of the hall, there are mechanical investments including BGA, tools, drying chambers and extraction technology. (English)
    20 July 2021
    0 references
    Le projet a pour objet la construction d’un site de fabrication moderne de panneaux en bois massif à 1 couche. Outre l’adaptation structurelle du hall, il y a des investissements mécaniques, y compris BGA, des outils, des chambres sèches et la technique d’aspiration. (French)
    27 November 2021
    0 references
    Het doel van het project is de bouw van een moderne productiefaciliteit voor massief houten panelen met 1 laag. Naast een structurele aanpassing van de hal zijn er ook mechanische investeringen zoals BGA, gereedschappen, droogkamers en extractietechnologie. (Dutch)
    29 November 2021
    0 references
    Heiligenkreuz im Lafnitztal
    0 references

    Identifiers

    AUST-935
    0 references