Continuation of the sidewalk in ul. Vysokomýtská (Q62484)

From EU Knowledge Graph
Revision as of 23:12, 28 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif du projet est de créer une route piétonne manquante, qui permettra aux piétons d’accéder à la zone industrielle et aux parties locales de Dvořisko et de Nořín. Cet objectif sera atteint par la construction d’un trottoir (chaussée continue) dans la rue. Haute-argent dans la zone de transport associée de la section de transit de la route II/357, séparée de la zone principale de transport par une zone verte. La longueur du trottoir propo...)
Jump to navigation Jump to search
Project Q62484 in Czech Republic
Language Label Description Also known as
English
Continuation of the sidewalk in ul. Vysokomýtská
Project Q62484 in Czech Republic

    Statements

    0 references
    1,175,992.73 Czech koruna
    0 references
    47,039.71 Euro
    1 October 2020
    0 references
    1,237,887.09 Czech koruna
    0 references
    49,515.48 Euro
    1 October 2020
    0 references
    95.0 percent
    0 references
    1 October 2017
    0 references
    30 June 2019
    0 references
    30 June 2019
    0 references
    Město Choceň
    0 references
    0 references

    50°0'15.8"N, 16°13'9.8"E
    0 references
    56501
    0 references
    Cílem projektu je vytvoření chybějící komunikace pro pěší, která zajistí pěší dostupnost průmyslové zóny a místních částí Dvořisko a Nořín. Tohoto cíle bude dosaženo výstavbou chodníku (pokračováním chodníku) v ul. Vysokomýtská v přidruženém dopravním prostoru průjezdního úseku silnice II/357, který bude od hlavního dopravního prostoru oddělen zeleným pásem. Délka navrhovaného chodníku je 330,62m, Šířka chodníku je v celé délce navržena v minimální hodnotě 1,75m. (Czech)
    0 references
    The aim of the project is to create a missing pedestrian road, which ensures the pedestrian accessibility of the industrial zone and local parts of Dvořisko and Nořín. This goal will be achieved by building a sidewalk (by continuing the sidewalk) in ul. Vysokomýtská in the associated transport area of the transit section of road II/357, which will be separated from the main traffic area by a green belt. The length of the proposed pavement is 330.62 m, The width of the pavement is designed in the whole length at a minimum value of 1.75 m. (English)
    23 October 2020
    0 references
    L’objectif du projet est de créer une route piétonne manquante, qui permettra aux piétons d’accéder à la zone industrielle et aux parties locales de Dvořisko et de Nořín. Cet objectif sera atteint par la construction d’un trottoir (chaussée continue) dans la rue. Haute-argent dans la zone de transport associée de la section de transit de la route II/357, séparée de la zone principale de transport par une zone verte. La longueur du trottoir proposé est de 330,62 m, la largeur du trottoir est conçue sur toute la longueur à une valeur minimale de 1,75 m. (French)
    29 November 2021
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0007174
    0 references