Children’s Group – Grandma II (Q54165)

From EU Knowledge Graph
Revision as of 19:36, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q54165 in Czech Republic
Language Label Description Also known as
English
Children’s Group – Grandma II
Project Q54165 in Czech Republic

    Statements

    0 references
    0 references
    0 references
    2,550,377.4 Czech koruna
    0 references
    102,015.10 Euro
    10 January 2020
    0 references
    3,000,444.0 Czech koruna
    0 references
    120,017.76 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    1 March 2017
    0 references
    31 August 2019
    0 references
    31 August 2019
    0 references
    Eduka Bábetko z.s.
    0 references
    0 references
    0 references

    49°33'35.35"N, 17°45'8.42"E
    0 references

    49°33'35.06"N, 17°44'3.30"E
    0 references
    75301
    0 references
    V rámci projektu bude provozována DS pro 12 dětí od 3 do 6 let. Místem realizace projektu bude Družební 769/2C, 779 00 Olomouc a předpokládaná otevírací doba bude od 7 do 16:30 hod. Fáze vybudování bude zahájena od 1. 3. 2017 a bude probíhat až do 31. 8. 2017, tedy 6 měsíců. Následně bude od 1. 9. 2017 zahájena provozní fáze, která potrvá 2 roky, tedy do 31. 8. 2019. Zařízení bude určeno pro širokou veřejnost a bude provozováno na základě zákona o dětské skupině. (Czech)
    0 references
    The project will host DS for 12 children from 3 to 6 years of age. The place of implementation of the project will be 769/2C, 779 00 Olomouc and the expected opening hours will be from 7 to 16:30 p.m. The construction phase will begin from 1. 3. 2017 and will run until 31. 8. 2017, 6 months. Then it’s going to be from 1. 9. 2017 The operational phase started, which will last for 2 years, i.e. until 31. 8. 2019. The facility will be intended for the general public and will be operated on the basis of the Children’s Group Act. (English)
    22 October 2020
    0 references
    Le projet exploitera une DS pour 12 enfants de 3 à 6 ans. L’emplacement du projet sera Družební 769/2C, 779 00 Olomouc et les heures d’ouverture prévues seront de 7 heures à 16 h 30. La phase de construction débutera à partir de 1. 3. 2017 et se déroulera jusqu’au 31. 8. 2017, c’est-à-dire six mois. Ce sera alors à partir de 1. 9. 2017, une phase opérationnelle de deux ans a débuté, c’est-à-dire jusqu’à 31 ans. 8. 2019. L’installation sera conçue pour le grand public et sera exploitée sur la base de la loi sur les groupes d’enfants. (French)
    28 November 2021
    0 references

    Identifiers

    CZ.03.1.51/0.0/0.0/16_132/0006666
    0 references