Construction modifications for production st. 134/1, Veletov (Q16133)

From EU Knowledge Graph
Revision as of 09:53, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q16133 in Czech Republic
Language Label Description Also known as
English
Construction modifications for production st. 134/1, Veletov
Project Q16133 in Czech Republic

    Statements

    0 references
    2,718,762.0 Czech koruna
    0 references
    108,750.48 Euro
    10 January 2020
    0 references
    5,437,524.0 Czech koruna
    0 references
    217,500.96 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    31 December 2019
    0 references
    Mgr. Petr Šedina
    0 references
    0 references

    50°1'58.19"N, 15°11'23.86"E
    0 references
    28002
    0 references
    Projekt společnosti Mgr. Petr Šedina je zaměřen na realizaci vybraných opatření, jejichž výstupem bude snížení energetické náročnosti vlastní nemovitosti. V rámci projektu bude provedeno:- zateplení obvodových konstrukcí budovy,- zateplení střechy objektu, - výměna otvorových výplní budovy, - instalace tepelného čerpadla, - montáž LED svítidel,- sekundárně bude řešeno větrání budovy vzhledem k jejímu účelu, a to mechanicky s rekuperací. a. (Czech)
    0 references
    Project of the company Mgr. Petr Grey is focused on the implementation of selected measures, the output of which will be to reduce the energy performance of the own property. Within the project will be carried out:- insulation of the building’s perimeter structures,- insulation of the roof of the building, – replacement of hole fillings of the building, – installation of heat pump, – installation of LED luminaires,- secondary solution will be the ventilation of the building due to its purpose, mechanically with recuperation. a. (English)
    22 October 2020
    0 references
    Projet de Mgr. Petr ŠEDINA se concentre sur la mise en œuvre de mesures sélectionnées, dont le résultat sera de réduire l’intensité énergétique de la propriété. Le projet réalisera:- l’isolation des structures du périmètre du bâtiment,- l’isolation du toit du bâtiment, — le remplacement des remplissages d’ouverture du bâtiment, — l’installation d’une pompe à chaleur, — l’installation de luminaires LED,- la solution secondaire sera la ventilation du bâtiment en raison de son objectif, mécaniquement avec récupération. (French)
    28 November 2021
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0012619
    0 references