Reconstruction of primary heat distribution to VS4 and VS5 in the housing estate North (Q3107668)
Jump to navigation
Jump to search
Project Q3107668 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of primary heat distribution to VS4 and VS5 in the housing estate North |
Project Q3107668 in Slovakia |
Statements
175,234.61 Euro
0 references
233,646.15 Euro
0 references
75.0 percent
0 references
4 January 2021
0 references
11 January 2021
0 references
Prievidzské tepelné hospodárstvo, a.s. (v skratke PTH, a.s.)
0 references
Hlavným cieľom predkladaného projektu je zvýšenie účinnosti systému CZT na sídlisku Sever v Prievidzi prostredníctvom rekonštrukcie časti tepelných rozvodov k okrskovým výmenníkovým staniciam VS4 a VS5. Tým sa dosiahne jeho optimalizácia, prispôsobenie zníženému dopytu po využiteľnom teple a vytvoria sa predpoklady na zníženie spotreby primárnej energie.Špecifickým cieľom projektu je zníženie strát tepla a úspora PEZ v systéme CZT v Prievidzi prostredníctvom rekonštrukcie a modernizácie časti rozvodov na sídlisku Sever. Predmetom projektu je rekonštrukcia podzemných tepelných rozvodov - horúcovodných primárnych prípojok na dvojrúrové z predizolovaných oceľových rúr, so zabudovaným monitorovacím systémom, umožňujúcim lokalizáciu prípadnej poruchy na potrubí. Projekt bude realizovaný prostredníctvom 1 hlavnej aktivity „Výstavba, rekonštrukcia a modernizácia rozvodov tepla“. Dĺžka realizácie projektu je 8 mesiacov, s predpokladaným začiatkom 04/2021 a ukončením 11/2021.Na základe energetického auditu bol stanovený potenciál úspor tepla znížením tepelných strát rozvodov tepla a z toho vyplývajúci potenciál úspor primárnych energetických zdrojov. Projekt má v dôsledku úspory PEZ i CO2 priaznivý dopad na životné prostredie Projektom budú dosiahnuté nasledovné merateľné ukazovatele:P0414 Počet systémov centralizovaného zásobovania teplom s vyššou účinnosťou: 1P0655 Úspora PEZ v systémoch centralizovaného zásobovania teplom: 1 071,226 MWh/rokP0103 Odhadované ročné zníženie emisií skleníkových plynov: 354,493 tekvCO2/rok. (Slovak)
0 references
The main objective of the present project is to increase the efficiency of the CZT system at the housing estate North in Prievidza through the reconstruction of part of the heat distribution to the precinct exchanger stations VS4 and VS5. This will achieve its optimisation, adaptation to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption.The specific objective of the project is to reduce heat loss and save PEZ in the CZT system in Prievidza through reconstruction and modernisation of part of distribution in the North settlement. The subject of the project is the reconstruction of underground thermal distributions – hot water primary connections to two-tubes of pre-insulated steel pipes, with built-in monitoring system, allowing the localisation of possible malfunctions on the pipes. The project will be implemented through 1 main activity “Construction, reconstruction and modernisation of heat distribution systems”. The duration of the implementation of the project is 8 months, with the expected beginning of 04/2021 and the end of 11/2021. Based on the energy audit, the potential for heat savings by reducing heat loss of heat distribution and the resulting primary energy saving potential was determined. The project has a positive impact on the environment due to the saving of both PEZ and CO2 The project will achieve the following measurable ukazovatele:P0414 Number of district heating systems with higher efficiency: 1P0655 Saving of PEZs in district heating systems: 1071,226 MWh/yearP0103 Estimated annual greenhouse gas emission reductions: 354,493 pumpCO2/year. (English)
28 September 2021
0 references
L’objectif principal du présent projet est d’accroître l’efficacité du système CZT dans le lotissement Nord de Prievidza par la reconstruction d’une partie de la distribution de chaleur aux stations d’échangeurs VS4 et VS5. L’objectif spécifique du projet est de réduire les pertes de chaleur et d’économiser PEZ dans le système CZT de Prievidza grâce à la reconstruction et à la modernisation d’une partie de la distribution dans la colonie nord. L’objet du projet est la reconstruction de distributions thermiques souterraines — raccordements primaires d’eau chaude à deux tubes de tuyaux en acier pré-isolés, avec système de surveillance intégré, permettant de localiser d’éventuels dysfonctionnements sur les tuyaux. Le projet sera mis en œuvre dans le cadre d’une activité principale «Construction, reconstruction et modernisation des systèmes de distribution de chaleur». La durée de mise en œuvre du projet est de 8 mois, le début prévu du 04/2021 et la fin du 11/2021. Sur la base de l’audit énergétique, le potentiel d’économies de chaleur en réduisant la perte de chaleur de la distribution de chaleur et le potentiel d’économies d’énergie primaire qui en résulte ont été déterminés. Le projet aura un impact positif sur l’environnement en raison des économies de PEZ et de CO2 Le projet permettra d’atteindre les objectifs mesurables suivants: ukazovatele:P0414 Nombre de systèmes de chauffage urbain à plus haut rendement: 1P0655 Sauvegarde des PEZ dans les systèmes de chauffage urbain: 1 071,226 MWh/anP0103 Réductions annuelles estimées des émissions de gaz à effet de serre: 354,493 pompeCO2/an. (French)
27 November 2021
0 references
Identifiers
310041AXS3
0 references