Construction of infrastructure for non-motorised transport in the territory of the town of Humenné (Q3102042)

From EU Knowledge Graph
Revision as of 21:43, 29 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de: translated_label)
Jump to navigation Jump to search
Project Q3102042 in Slovakia
Language Label Description Also known as
English
Construction of infrastructure for non-motorised transport in the territory of the town of Humenné
Project Q3102042 in Slovakia

    Statements

    0 references
    105,043.91 Euro
    0 references
    123,581.07 Euro
    0 references
    85.0 percent
    0 references
    1 June 2020
    0 references
    1 May 2021
    0 references
    Mesto Humenné
    0 references
    0 references

    48°56'1.97"N, 21°54'38.59"E
    0 references
    Zámerom predkladaného projektu "Výstavba infraštruktúry pre nemotorovú dopravu na území mesta Humenné" je zvýšenie atraktivity a prepravnej kapacity nemotorovej dopravy - cyklistickej dopravy na celkovom počte prepravovaných osôb a to prostredníctvom dvoch hlavných aktivít, ktoré spočívajú vo výstavbe prepojovacieho cyklochodníka od starého Valaškovského mosta po cyklochodník na hrádzi pri Laborci a doplnkovej cyklistickej infraštruktúry v rámci ktorej sa rieši umiestnenie cyklostojanov s prestrešením a cyklostojanov pozdĺž vybudovaného a plánovaného cyklochodníka. Projekt  vytvorí podmienky pre lepšiu mobilitu obyvateľov mesta tým, že prispeje k dostatočne vybudovanej  a kompaktnej sieti cyklotrás v meste. Ďalej prispeje k zmene deľby prepravnej práce v prospech environmentálne priaznivejších módov dopravy a k zvýšeniu podielu využívania cyklistickej dopravy, čím odľahčí centrá miest  od postupne narastajúcej miery automobilizácie a vytvorí pozitívny environmentálny efekt v podobe zníženia miery znečistenia ovzdušia, hluku a vibrácií.  Projekt je v súlade s oprávnenými aktivitami, nakoľko sa bude venovať infraštruktúre pre nemotorovú dopravu a propagácii a zvyšovaniu atraktivity cyklistickej dopravy pre verejnosť. Predkladaným projektom sa zabezpečí prepojenosť existujúcej resp.plánovanej cyklistickej infraštruktúry s občianskou infraštruktúrou, priemyselnou zónou a infraštruktúru verejnej osobnej dopravy. Projekt plne korešponduje s príslušnými strategickými dokumentmi pre oblasť dopravy. Merateľnými ukazovateľmi sú: Dĺžka nových úsekov cyklistických komunikácií= 0,2174     km; Počet vytvorených prvkov doplnkovej cyklistickej infraštruktúry= 7. (Slovak)
    0 references
    The aim of the present project “Construction of infrastructure for non-motor transport in the city of Humenné” is to increase the attractiveness and transport capacity of non-motorised transport – cycling on the total number of passengers transported, through two main activities, which consist of the construction of a connecting cycle path from the old Valaškovský bridge to the cycling path at the dam near Laborec and the additional cycling infrastructure within which the location of cycling stands with roofing and cycling stands along the built and planned cycling pathway is addressed. The project will create conditions for better mobility of the city’s inhabitants by contributing to a sufficiently built and compact network of cycle paths in the city. It will also contribute to a change in the division of transport work in favour of more environmentally friendly modes of transport and to an increase in the share of cycling, thus lightening urban centres from a gradually increasing rate of caring and creating a positive environmental effect in terms of reducing air pollution, noise and vibration.  The project is in line with the eligible activities, as it will be dedicated to infrastructure for non-motor transport and to promoting and increasing the attractiveness of cycling to the public. The present project will ensure that existing or planned cycling infrastructure is interconnected with the civil infrastructure, the industrial zone and the public passenger transport infrastructure. The project fully corresponds with the relevant transport strategy papers. Measurable indicators are: Length of new cycle roads = 0.2174 km; Number of additional cycling infrastructure elements created= 7. (English)
    28 September 2021
    0 references
    L’objectif du présent projet «Construction d’infrastructures pour le transport non motorisé dans la ville de Humenné» est d’accroître l’attractivité et la capacité de transport des transports non motorisés — à vélo sur le nombre total de passagers transportés, par le biais de deux activités principales, qui consistent en la construction d’une piste cyclable reliant l’ancien pont de Valaškovský à la piste cyclable du barrage près de Laborec et l’infrastructure cyclable supplémentaire au sein de laquelle l’emplacement des stands cyclables avec toitures et stands cyclables le long de la piste cyclable construite et prévue est abordé. Le projet créera les conditions d’une meilleure mobilité des habitants de la ville en contribuant à un réseau suffisamment construit et compact de pistes cyclables dans la ville. Elle contribuera également à une modification de la répartition des travaux de transport en faveur de modes de transport plus respectueux de l’environnement et à une augmentation de la part du vélo, ce qui allégera les centres urbains à partir d’un rythme croissant de soins et créera un effet positif sur l’environnement en termes de réduction de la pollution de l’air, du bruit et des vibrations.  Le projet est conforme aux activités éligibles, étant donné qu’il sera consacré aux infrastructures de transport non motorisé et à la promotion et à l’augmentation de l’attrait du vélo auprès du public. Le présent projet permettra d’assurer l’interconnexion des infrastructures cyclables existantes ou prévues avec les infrastructures civiles, la zone industrielle et les infrastructures de transport public de voyageurs. Le projet correspond pleinement aux documents de stratégie pertinents en matière de transport. Les indicateurs mesurables sont les suivants: Longueur des nouvelles routes cyclables = 0,2174 km; Nombre d’éléments d’infrastructure cyclable supplémentaires créés= 7. (French)
    27 November 2021
    0 references

    Identifiers

    302011M332
    0 references