Energy renovation of the General Medical Building at Gajeva 21, Virovitica (Q2733110)

From EU Knowledge Graph
Revision as of 10:14, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet prévoit une rénovation énergétique qui comprend quatre mesures de construction visant à améliorer l’enveloppe de protection thermique (murs à l’avant du bâtiment, plafond vers le grenier, toit accroché au plafond et remplacement de la menuiserie extérieure), ainsi que quatre mesures mécaniques (reconstruction des systèmes de chauffage, installation de vannes thermostatiques et installation de capteurs solaires pour la préparation de l’...)
Jump to navigation Jump to search
Project Q2733110 in Croatia
Language Label Description Also known as
English
Energy renovation of the General Medical Building at Gajeva 21, Virovitica
Project Q2733110 in Croatia

    Statements

    0 references
    819,485.75 Croatian kuna
    0 references
    106,533.15 Euro
    2 June 2021
    0 references
    1,344,727.5 Croatian kuna
    0 references
    174,814.58 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    16 October 2018
    0 references
    16 October 2020
    0 references
    VIROVITIČKO-PODRAVSKA ŽUPANIJA
    0 references
    0 references

    45°49'53.94"N, 17°23'7.94"E
    0 references
    33000
    0 references
    Projektom je planirana energetska obnova koja obuhvaća četiri građevinske mjere za poboljšanje toplinske zaštitne ovojnice (zidovi na pročelju zgrade, strop prema tavanu, strop-kosi krov, te zamjenu vanjske stolarije), te četiri strojarske mjere (rekonstrukciju sustava grijanja, ugradnje termostatskih ventila te postavljanje solarnih kolektora za pripremu tople vode, te razdvajanje mjerenja - vode i struje) a sve u cilju smanjenja utroška energije i štetnih emisija CO2. (Croatian)
    0 references
    The project is planned with energy renovation covering four construction measures for improving the thermal protective envelope (walls on the building side, ceiling to attic, ceiling hair roof, replacement of external joinery), and four engine engineering measures (reconstruction of the heating system, installation of thermostatic valves and installation of solar collectors for hot water generation, and metering and water separation), with a view to reducing energy input and harmful CO2 emissions. (English)
    3 June 2021
    0 references
    Le projet prévoit une rénovation énergétique qui comprend quatre mesures de construction visant à améliorer l’enveloppe de protection thermique (murs à l’avant du bâtiment, plafond vers le grenier, toit accroché au plafond et remplacement de la menuiserie extérieure), ainsi que quatre mesures mécaniques (reconstruction des systèmes de chauffage, installation de vannes thermostatiques et installation de capteurs solaires pour la préparation de l’eau chaude, et séparation des mesures — eau et électricité) afin de réduire la consommation d’énergie et les émissions nocives de CO2. (French)
    29 November 2021
    0 references

    Identifiers

    KK.04.2.1.04.0303
    0 references