CEMIS 2015-2016 program — MIKES (VTT Oy) — development of flow modelling and monitoring platform based on UWB and impulse radar technology (Q3749215)

From EU Knowledge Graph
Revision as of 09:55, 23 November 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3749215 in France
Language Label Description Also known as
English
CEMIS 2015-2016 program — MIKES (VTT Oy) — development of flow modelling and monitoring platform based on UWB and impulse radar technology
Project Q3749215 in France

    Statements

    0 references
    0 references
    173,448 Euro
    0 references
    235,283.0 Euro
    0 references
    73.72 percent
    0 references
    1 January 2015
    0 references
    31 December 2016
    0 references
    Teknologian tutkimuskeskus VTT Oy
    0 references

    64°12'27.14"N, 27°43'37.67"E
    0 references
    87100
    0 references
    CEMIS 2015-2016 ohjelma koostuu viidestä rinnakkaisesta kehittämishankkeesta. MIKES (VTT Oy) yksi tehtävä on toimia eri CEMIS –osapuolten hankkeissa mittausten luotettavuuteen jäljitettävyyteen liittyvissä asioissa, siten, että mittausmenetelmät ovat kaikilta osin luotettavia ja mittaustuloksella on määritetty epävarmuus, joka perustuu matemaat-tiseen mittausta kuvaavaan malliin. Mallissa on otettu huomioon kaikki mittausepävarmuuteen vaikuttavat tekijät aina standardikuvaajan muodostamisesta lähtien. Tässä rinnakkaishankkeessa MIKES (VTT Oy) kehittää omaa mallintamisosaamistaan nestevirtauksessa tapahtuvien ilmiöiden suhteen. Tämä on tärkeää, jotta ymmärretään esim. erilaisten rakenteiden vaikutus virtausprofiiliin. Hankkeessa toteutetaan myös demonstraattori (VTT node) UWB (Ultra Wide Band) ja impulssitutkateknologiaan perustuvasta uuden tyyppisestä materiaalivirtojen monitorointimenetelmästä. (Finnish)
    0 references
    CEMIS 2015-2016 consists of five parallel development projects. One of the tasks of MIKES (VTT Oy) is to act in the projects of various CEMIS partners in matters related to the traceability of measurements, so that the measurement methods are fully reliable and the measurement result has been determined with uncertainty based on a mathematical measurement model. All factors affecting measurement uncertainty have been taken into account in the model since the standard descriptor was created. In this parallel project, MIKES (VTT Oy) develops its own modelling expertise with regard to phenomena occurring in liquid flow. This is important to understand, for example, the impact of different structures on the flow profile. The project will also implement a demonstration (VTT node) UWB (Ultra Wide Band) and a new type of material flow monitoring method based on impulse radar technology. (English)
    22 November 2021
    0 references

    Identifiers

    0 references