“Reconstruction and development of the provincial road No 559 on the section Lipno-Karst — border of the province” (Q98559)

From EU Knowledge Graph
Revision as of 10:25, 10 March 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The project envisages the reconstruction of DV No 559 on the section Linoe — Kakar — border of the province (22.093 km). Planned: — replacement of existing pavements, — implementation of the binding and sewage layers, — reconstruction of the roundabout to the intersection of the DW559 intersection with the DW541 road, — construction of bus bays; — construction of road junctions and culverts; — construction of road infrastructure in connection...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Reconstruction and development of the provincial road No 559 on the section Lipno-Karst — border of the province”
Project in Poland financed by DG Regio

    Statements

    0 references
    56,453,141.87 zloty
    0 references
    13,548,754.048799999 Euro
    13 January 2020
    0 references
    66,415,461.03 zloty
    0 references
    15,939,710.6472 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2019
    0 references
    WOJEWÓDZTWO KUJAWSKO-POMORSKIE
    0 references
    Projekt przewiduje przebudowę DW nr 559 na odcinku Lipno- Kamień Kotowy - granica województwa (22,093 km). Zaplanowano:- wymianę konstrukcji istniejących nawierzchni,- wykonanie warstwy wiążącej i ścieralnej,- przebudowę na rondo skrzyżowania DW559 z DW541- budowę ciągów pieszo-rowerowych,- budowę zatok autobusowych,- budowę zjazdów gospodarczych i przepustów pod nimi,- budowę oświetlenia drogowego;- przebudowę przepustów, zastosowanie na krawędziach barier ochronnych i realizację 6 nowych dla zachowania migracji płazów i zwierzyny,- rozbiórkę wiaduktu nad byłą kolejką wąskotorową,- przebudowę sieci infrastruktury technicznej kolidujących z planowanym układem drogowym;- wykonanie oznakowania z uwzględnieniem potrzeb osób niepełnosprawnych,- przygotowanie miejsca dla drogowej stacji meteorologicznej,- przygotowanie miejsca do pomiaru prędkości,- budowę miejsca do ważenia i kontroli pojazdów,- wycinkę drzew i krzewów.Celem głównym projektu jest zwiększenie dostępności transportowej dróg województwa, zwłaszcza połączenia dróg regionu z zewnętrznym układem komunikacyjnym, w tym siecią TEN-T. Celami szczegółowymi są:- zwiększenie dostępności ośrodka powiatowego (Lipno);- poprawa warunków do rozwoju przedsiębiorczości poprzez zwiększenie łatwości dojazdu do Płockiego Parku Przemysłowo-Technicznego- poprawa bezpieczeństwa ruchu drogowego oraz warunków jazdy;- dostosowanie drogi do przeniesienia zwiększonego ruchu pojazdów, w tym pojazdów ciężarowych;- doprowadzenie drogi do zgodności z warunkami technicznymi stawianymi drodze klasy GInwestycja przyczyni się do realizacji następujących wskaźników:- produktu: Długość przebudowanych dróg wojewódzkich – 22,093 km;- rezultatu: Wskaźnik nośności drogi wojewódzkiej – 100 kN/oś.DW 559 zapewnia łączność regionu z zewnętrznym układem komunikacyjnym (włączenie do sieci TEN-T poprzez DK 67 w Lipnie). Ponadto droga usprawni połączenie pomiędzy Toruniem i Płockiem (poprzez DK nr 10) oraz pomiędzy ośrodkiem powiatowym Lipno i Płockiem. (Polish)
    0 references
    The project envisages the reconstruction of DV No 559 on the section Linoe — Kakar — border of the province (22.093 km). Planned: — replacement of existing pavements, — implementation of the binding and sewage layers, — reconstruction of the roundabout to the intersection of the DW559 intersection with the DW541 road, — construction of bus bays; — construction of road junctions and culverts; — construction of road infrastructure in connection with the planned road transport system; — construction of a location for measuring the road station; — preparation of a space for measuring the speed; — construction of a space for road traffic weighing stations; — construction of a space for measuring road traffic; — construction of a space for road transport; — to improve road traffic safety and driving conditions; — to adapt the road to the transfer of increased traffic, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for the development of vehicles, including heavy goods vehicles; — bringing the road to compliance with technical conditions for vehicles of Length of reconstructed regional roads — 22.093 km; — result: The load-capacity index of the provincial road — 100 kN/day DW 559 ensures the connectivity of the region with the external communication system (integration into the TEN-T network through DK 67 in Lipno). (English)
    0 references

    Identifiers

    RPKP.05.01.00-04-0008/17
    0 references