Support for decentralised energy in the Bieszczeszczech municipality through the installation of renewable energy systems for households. (Q118500)

From EU Knowledge Graph
Revision as of 17:51, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Support for decentralised energy in the Bieszczeszczech municipality through the installation of renewable energy systems for households.
Project in Poland financed by DG Regio

    Statements

    0 references
    9,214,372.3 zloty
    0 references
    2,211,449.352 Euro
    13 January 2020
    0 references
    14,628,953.04 zloty
    0 references
    3,510,948.7295999997 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    21 March 2017
    0 references
    30 September 2019
    0 references
    GMINA USTRZYKI DOLNE
    0 references
    Projekt „parasolowy” realizowany w partnerstwie (Lider-Gmina Ustrzyki Dolne, Partnerzy: Gmina Czarna, Olszanica, Solina, Cisna), dotyczy budowy jednostek wytwarzania energii z OZE: zestawów fotowoltaicznych(o mocy 2,04 do 5,10 kW), instalacji solarnych (o mocy 2,86 do 4,29 kW), kotłów na biomasę (o mocy od 15 do 45 kW każdy), pomp ciepła (o mocy od 6 do 13 kW), w Gminie Ustrzyki Dolne: panele fotowoltaiczne 144 szt., instalacje solarne 56 szt., pompy ciepła 21 szt., kotły klasy 5 na biomasę 48 szt. w Gminie Czarna: panele fotowoltaiczne 30 szt., instalacje solarne 27 szt., pompy ciepła 1 szt., kotły klasy 5 na biomasę 10 szt. w Gminie Olszanica: panele fotowoltaiczne 111 szt., instalacje solarne 54 szt., pompy ciepła 3 szt., kotły klasy 5 na biomasę 33 szt. w Gminie Solina: panele fotowoltaiczne 96 szt., instalacje solarne 63 szt., pompy ciepła 1 szt., kotły klasy 5 na biomasę 21 szt. w Gminie Cisna: panele fotowoltaiczne 24 szt., instalacje solarne 12 szt., pompy ciepła 14 szt., kotły klasy 5 na biomasę 9 szt. Lider projektu w kompleksowy sposób zapewni przygotowanie, realizację i koordynację projektu. Celem projektu jest zwiększenie wytwarzania energii z OZE w źródłach rozproszonych, zmniejszenie emisji gazów cieplarnianych oraz kosztów zużycia energii w gospodarstwach domowych. Łącznie projektem zostanie objętych 645 gospodarstw domowych, w tym 108 dotkniętych ubóstwem energetycznym. Moc zadeklarowana z OZE wyniesie: panele fotowoltaiczne–1,54 MW, kolektory słoneczne–0,82 MW, pompy ciepła– 0,35, kotły na biomasę– 2,77 MW. Efektywność kosztowa projektu wyniesie 2 692 101,61 zł/MW. Projekt jest zgodny z PGN gmin partnerskich. Mieszkańcy zadeklarowali wniesienie wkładu własnego w wysokości 30% netto plus podatek VAT wartości instalacji OZE. Projekt nie wymaga uzyskania pozwoleń na budowę ani zgłoszenia robót budowlanych. Wnioskodawca zapewnia że w ramach projektu zastosowane zostaną mechanizmy uwzględniające wszystkich użytkowników zgodnie z zasadami projektowania (Polish)
    0 references
    Partnership project implemented in partnership (Lider-Lmin Ustryki Dolne, Partners: The municipality of Czarna, Olszica, Solina, Cisna) concerns the construction of units producing energy from RES: solar kits (2,04 to 5.10 kW), solar installations (2,86 to 4.29 kW), biomass boilers (between 15 and 45 kW each), heat pumps (between 6 and 13 kW), in the municipality of Lower Silesia: 144 solar panels, 56 solar installations, 21 heat pumps, boilers 5 for biomass 48 in the Gmina Czarna: 30 solar panels, 27 solar installations, 1 heat pumps, boilers of class 5 for biomass 10 in the municipality of Olszałica: 111 solar panels, 54 solar installations, 3 heat pumps, boilers 5 for biomass 33 in the municipality of Solina: 96 solar panels, 63 solar installations, 1 heat pumps, boilers 5 for biomass 21 in the municipality of Cisna: 24 solar panels, 12 solar installations, 14 heat pumps, boilers 5 for biomass 9. The project leader will ensure project preparation, implementation and coordination in a comprehensive manner. The aim of the project is to increase the generation of energy from renewable sources in distributed sources, to reduce greenhouse gas emissions and the cost of household energy consumption. The project will include 645 households, including 108 affected by energy poverty. The declared power from RES will be as follows: solar panels — 1.54 MW, solar collectors 0.82 MW, liquid pumps — 0.35 MW, biomass boilers — 2.77 MW. The cost efficiency of the project will be PLN 2 692 101,61/MW. The project is in line with the PGN of the partner municipalities. The inhabitants declared a net contribution of 30 % net plus VAT on the value added tax of the RES installations. The project does not require the obtaining of building permits and the notification of construction works. The applicant shall ensure that the project involves mechanisms involving all users in accordance with the design principles. (English)
    0 references

    Identifiers

    RPPK.03.01.00-18-0061/17
    0 references