Renovation of public buildings: The TSO of the Dyów ul. Barkówka, the TSO of the Dyów, ul. School, Primary School No 2 at ul. Dínówka in Dynów, Building of the Municipal Office in Dynów (Q118622)

From EU Knowledge Graph
Revision as of 17:54, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation of public buildings: The TSO of the Dyów ul. Barkówka, the TSO of the Dyów, ul. School, Primary School No 2 at ul. Dínówka in Dynów, Building of the Municipal Office in Dynów
Project in Poland financed by DG Regio

    Statements

    0 references
    1,175,555.95 zloty
    0 references
    282,133.42799999996 Euro
    13 January 2020
    0 references
    1,823,637.62 zloty
    0 references
    437,673.02880000003 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2014
    0 references
    31 December 2017
    0 references
    GMINA MIEJSKA DYNÓW
    0 references
    Celem projektu jest poprawa efektywności budynków użyteczności publicznej w Dynowie do poziomu budownictwa energooszczędnego z równoczesnym wprowadzaniem systemu zarządzania energią. W ramach projektu, poddane zostaną termomodernizacji 4 budynki użyteczności publicznej tj. dwa budynki OSP, Szkoła Podstawowa oraz budynek Urzędu Miejskiego w Dynowie. W budynku Urzędu Miejskiego wykonane zostaną m.in. izolacje termiczne ścian zewnętrznych oraz fundamentowej a także izolacja termiczna dachu nad wykuszami. Ponadto, wymieniona zostanie stolarka drzwiowa i okienna oraz wykonana zostanie modernizacja inst. grzewczej poprzez wymianę kotła grzewczego wraz z przebudową inst. CO. W ramach projektu wykonane zostanie oświetlenie energooszczędne oraz zamontowany zostanie zestaw mikroźródła OZE -instalacja fotowoltaiczna. Budynek OSP przy ul. Szkolnej- planuje się m.in. wykonanie izolacji termicznej stropu oraz ścian zewnętrznych i fundamentowej wraz z wymianą stolarki drzwiowej i okiennej. Zaplanowano także montaż kotła grzewczego wraz z modernizacją inst. CO oraz CWU. Ponadto zamontowane zostanie oświetlenie energooszczędne oraz zestaw mikroźródła OZE – inst. fotowoltaiczna. Budynek OSP przy ul. Bartkówka- wykonana zostanie izolacja termiczna stropu ostatniej kond. oraz ścian zewn. i fundament. wraz z wymianą stolarki drzwiowej i okiennej. Ponadto planuje się montaż kotła grzewczego wraz z modernizacją instalacji CO oraz CWU a także wykonanie oświetlenia energooszczędnego. Ponadto zamontowany zostanie zestaw mikroźródła OZE -instalacja fotowoltaiczna. W budynku SP nr 2 w wykonana zostanie m.in. izolacja termiczna ścian zewn. oraz stropu parteru, wymiana stolarki drzwiowej i okiennej oraz wymiana oświetlenia na energooszczędne. Reasumując w ramach projektu zmodernizowane zostaną 4 budynki, wybudowane zostaną 3 jednostki wytwarzania energii elektrycznej z OZE, oraz zmodernizowane zostaną 3 źródła ciepła. (Polish)
    0 references
    The aim of the project is to improve the efficiency of public buildings in the Dynów in the construction of energy-efficient buildings with the simultaneous introduction of an energy management system. The project will undergo thermal modernisation of 4 public utility buildings, i.e. two buildings of the TSO, the Primary School and the Urban Office in the Dynów. The Urban Authority building will include, inter alia, thermal insulation of external walls and core insulation as well as thermal insulation of the roof over the purchase. In addition, the door and window joinery will be replaced and the heating unit will be upgraded by replacing the heating boiler with the control of the heating boiler. In the framework of the project, energy efficient lighting will be carried out and a set of micro-renewable energy sources will be installed. The TSO building at ul. The execution of the thermal insulation of the ceiling and of the external walls and of the foundation is planned, including the replacement of doors and window frames. It is also planned to install a heating boiler along with a modernisation of the boiler. Co and CWU. In addition, energy efficient lighting and a set of micro-PV sources will be installed. The TSO building at ul. The thermal insulation of the last cond. and outer walls shall be performed with the replacement of the door and window frames. In addition, it is planned to install a boiler along with the modernisation of the CO and CWUs installations as well as efficient lighting. In addition a set of micro-renewable energy sources, a photovoltaic installation, will be installed. In SP 2, inter alia, the thermal insulation of the outer walls and of the ground floor, replacement of doors and window frames and replacement of lighting with energy-efficient ones will be carried out. In short, 4 buildings will be modernised, 3 RES electricity generation units will be built and 3 heat generators will be modernised. (English)
    0 references

    Identifiers

    RPPK.03.02.00-18-0005/16
    0 references