Comprehensive renovation of the buildings of the Gimpjonum and the school/pre-school group in Chynów (Q108962)

From EU Knowledge Graph
Revision as of 13:22, 26 March 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive renovation of the buildings of the Gimpjonum and the school/pre-school group in Chynów
Project in Poland financed by DG Regio

    Statements

    0 references
    2,103,471.79 zloty
    0 references
    504,833.22959999996 Euro
    13 January 2020
    0 references
    3,205,728.28 zloty
    0 references
    769,374.7871999999 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 January 2016
    0 references
    15 December 2019
    0 references
    GMINA CHYNÓW
    0 references

    51°54'21.6"N, 21°4'59.9"E
    0 references
    Projekt będzie polegał na modernizacji dwóch budynków użyteczności publicznej w Chynowie: - Zespół szkolno-przedszkolny (ZSP) - Gimnazjum publiczne Zakres inwestycji obejmie docieplenie ścian, posadzek i dachów budynków. Wymieniona zostanie część stolarki okienno-drzwiowej. W obu budynkach zostaną wymienione instalacje elektryczne i oprawy oświetleniowe na LED. Zmodernizowana zostanie instalacja centralnego ogrzewania. Oba budynki zostaną także wyposażone w system automatycznej regulacji temperatury w budynku. Koszty kwalifikowane projektu obejmują koszty inwestycyjne wyszczególnione w audytach energetycznych sporządzonych dla budynków wymienionych powyżej oraz niezbędne koszty przygotowawcze (studium, projekty, audyty). Projekt będzie realizowany w okresie od marca do końca grudnia 2017 roku, z tym że koszty przygotowawcze do projektu zostały już poniesione w czwartym kwartale 2015 roku, a część zostanie poniesiona w pierwszym kwartale 2016 roku. (Polish)
    0 references
    The project will consist of the modernisation of two public buildings in Chynów: — PSP — Public Investment Coverage will include the insulation of walls, floor floors and buildings. This will be part of the window/door joinery. Electrical installations and lighting fittings for LED will be listed in both buildings. The installation of a central heating system will be modernised. Both buildings will also be equipped with an automatic temperature control system in the building. The eligible costs of the project include the investment costs specified in the energy audits of the buildings listed above and the necessary preparatory costs (study, projects, audits). The project will run from March to the end of December 2017, except that preparatory costs for the project have already been incurred in the fourth quarter of 2015 and part will be incurred in the first quarter of 2016. (English)
    0 references

    Identifiers

    RPMA.04.02.00-14-4606/16
    0 references