No label defined (Q3678910)

From EU Knowledge Graph
Revision as of 11:32, 18 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The present operation concerns a construction package comprising 80 dwellings spread over 4 sets of R+ 4 buildings dating from 1960 first rehabilitated in 1993 The type of dwellings corresponds to the following breakdown: 10T2-30 T3-30 T4-10 T5 The operation consists of the energy renovation of these buildings with the following works: — Treatment of the building envelope by means of thermal insulation from the outside, replacement of exterior m...)
Jump to navigation Jump to search
Project Q3678910 in France
Language Label Description Also known as
English
No label defined
Project Q3678910 in France

    Statements

    0 references
    390,400.0 Euro
    0 references
    1,600,000.0 Euro
    0 references
    24.4 percent
    0 references
    31 December 2018
    0 references
    1 June 2020
    0 references
    Le Foyer Rémois
    0 references
    La présente opération porte sur un ensemble de construction comprenant 80 logements répartis sur 4 ensembles de bâtiments R+4 datant de 1960 réhabilités une première fois en 1993 La typologie des logements correspond à la répartition suivante : 10T2 - 30 T3 - 30 T4 - 10 T5 L'opération consiste en la rénovation énergétique de ces bâtiments avec les travaux suivants : - Traitement de l'enveloppe du bâtiment via l'isolation thermique par l'extérieur, le remplacement des meuiseries extérieures et la refection des toitures; - Amélioration des productions et distributions de chauffage et d'eau chaude sanitaire; - Création de VMC; - Fermeture des balcons - Remplacement des portes palières L'opération répond également à des obligations de sécurisation et de sécurité: - Reprise du contrôle d'accès et de l'interphonie - Mise au normes aux niveaux électrique, accessibilité et incendie (French)
    0 references
    The present operation concerns a construction package comprising 80 dwellings spread over 4 sets of R+ 4 buildings dating from 1960 first rehabilitated in 1993 The type of dwellings corresponds to the following breakdown: 10T2-30 T3-30 T4-10 T5 The operation consists of the energy renovation of these buildings with the following works: — Treatment of the building envelope by means of thermal insulation from the outside, replacement of exterior mills and refection of roofs; — Improvement of the production and distribution of heating and domestic hot water; — Creation of VMC; — Closure of balconies — Replacement of landing doors The operation also meets security and safety obligations: — Resumption of access control and interphony — Standardisation at electrical, accessibility and fire levels (English)
    18 November 2021
    0 references

    Identifiers

    CA0024032
    0 references