No label defined (Q3669188)

From EU Knowledge Graph
Revision as of 11:08, 18 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The municipality of Soorts-Hossegor wishes to carry out work consisting of the elimination of direct discharges of rainwater to the sea lake with the aim of improving the quality of the waters of the oyster farm and bathing areas of the lake, thus protecting the population. A numerical modeling tool makes it possible to understand the relevance of the project. The media gains are very significant and homogeneous, ranging from 70 % to 100 % depen...)
Jump to navigation Jump to search
Project Q3669188 in France
Language Label Description Also known as
English
No label defined
Project Q3669188 in France

    Statements

    0 references
    204,750.00 Euro
    0 references
    455,000.0 Euro
    0 references
    45.0 percent
    0 references
    2 February 2015
    0 references
    31 December 2016
    0 references
    COMMUNE DE SOORTS HOSSEGOR
    0 references
    La commune de Soorts-Hossegor souhaite réaliser des travaux consistant en la suppression des rejets directs d'eaux pluviales au lac marin dans le but d'améliorer la qualité des eaux du parc ostréicole et des zones de baignade du lac, donc de protéger les populations. Un outil de modélisation numérique permet d'appréhender la pertinence du projet. Les gains milieux sont très significatifs et homogènes, de l'ordre de 70% à 100% en fonction du phasage de l'évènement pluvieux avec le cycle des marées.Afin de supprimer les 16 exutoires directs ou indirects d'eaux pluviales situés sur le rive Est du lac, un seul exutoire pluvial va être réalisé : 4 rejets y seront raccordés, les 11 autres seront supprimés (French)
    0 references
    The municipality of Soorts-Hossegor wishes to carry out work consisting of the elimination of direct discharges of rainwater to the sea lake with the aim of improving the quality of the waters of the oyster farm and bathing areas of the lake, thus protecting the population. A numerical modeling tool makes it possible to understand the relevance of the project. The media gains are very significant and homogeneous, ranging from 70 % to 100 % depending on the phase of the rain event with the tidal cycle.In order to remove the 16 direct or indirect outlets of rainwater located on the east shore of the lake, only one storm outlet will be realised: 4 releases will be connected, the remaining 11 will be removed (English)
    18 November 2021
    0 references
    18 Avenue de Paris, 40150 Soorts-Hossegor, France
    0 references

    Identifiers

    2699910
    0 references