No label defined (Q3312787)

From EU Knowledge Graph
Revision as of 22:14, 24 October 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): 1) Optimise the existing lighting system by installing automatic control elements to reduce unnecessary lighting. For this purpose, presence detectors, motion detectors, brightness sensors and the corresponding controls are installed.2) Optimisation of the extraction systems to adapt to the variable conditions by installing sensors and frequency converters. Only air volumes necessary for the processes are moved. 3) Optimisation of the climatic c...)
Jump to navigation Jump to search
Project Q3312787 in Germany
Language Label Description Also known as
English
No label defined
Project Q3312787 in Germany

    Statements

    0 references
    279,127.99 Euro
    0 references
    938,245.36 Euro
    0 references
    29.75 percent
    0 references
    30 November 2018
    0 references
    15 August 2019
    0 references
    Hartkorn Gewürzmühle GmbH
    0 references
    56218
    0 references
    1) Optimieren der vorhandenen Beleuchtungsanlage durch Einbau automatischer Steuerungselemente zur Reduzierung der unnötigen Beleuchtung. Hierzu werden Präsenzmelder, Bewegungsmelder, Helligkeitssensoren und die dazugehörigen Steuerungen eingebaut.2) Optimierung der Absauganlagen zur bedarfsgerechten Anpassung an die variablen Bedingungen durch Einbau von Sensoren und Frequenzumrichter. Es werden nur noch für die Prozesse nötigen Luftmengen bewegt. 3) Optimierung der klimatischen Bedingungen im Lagerbereich: Reduktion der Klimatisierung 4) Reduzierung des Druckniveaus der Druckluft.5) Ersatz einer veralteten Abfüllanlage durch eine hocheffiziente neue Abfüllanlage: die vorhandenen Abfüllanlage ist energetisch veraltet und wird durch eine neue Anlage ersetzt. Die gesamte Anlage besteht aus Abfüllung, Verschliesser, Etikettierung und der dazugehörigen Verpackungslinie.6) Installation einer Photovoltaikanlage zur Eigenstromnutzung. (German)
    0 references
    1) Optimise the existing lighting system by installing automatic control elements to reduce unnecessary lighting. For this purpose, presence detectors, motion detectors, brightness sensors and the corresponding controls are installed.2) Optimisation of the extraction systems to adapt to the variable conditions by installing sensors and frequency converters. Only air volumes necessary for the processes are moved. 3) Optimisation of the climatic conditions in the storage area: Reduction of air conditioning 4) Reduction of compressed air pressure level.5) Replacement of an outdated filling line with a highly efficient new filling line: the existing filling line is out of date and will be replaced by a new plant. The entire plant consists of bottling, sealers, labelling and the associated packaging line.6) Installation of a photovoltaic system for self-consumption. (English)
    25 October 2021
    0 references
    Koblenz, Kreisfreie Stadt
    0 references

    Identifiers

    DE_TEMPORARY_15574
    0 references