Requalification and Modernisation of the Alexandre Herculano Secondary School facilities (Q2899347)

From EU Knowledge Graph
Revision as of 21:43, 21 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying budgets in portugal one item from slovenia)
Jump to navigation Jump to search
Project Q2899347 in Portugal
Language Label Description Also known as
English
Requalification and Modernisation of the Alexandre Herculano Secondary School facilities
Project Q2899347 in Portugal

    Statements

    0 references
    5,100,000.0 Euro
    0 references
    6,000,000.0 Euro
    0 references
    85.0 percent
    0 references
    9 December 2019
    0 references
    11 December 2021
    0 references
    MUNICIPIO DO PORTO
    0 references
    0 references

    41°9'3.85"N, 8°35'38.26"W
    0 references
    Este projeto assegura a reabilitação e modernização do edifício da Escola Secundária Alexandre Herculano.A solução proposta mantém especial atenção ao valor histórico, assumindo a eliminação das construções sem qualidade arquitetónica que foram realizadas.Nesse sentido e no respeito pelo desenho original é proposta a abertura, ao nível do piso 0, de todos os vãos de comunicação, também alterados, entre as galerias/corredores e espaços exteriores. (Portuguese)
    0 references
    This project ensures the rehabilitation and modernisation of the building of the Alexandre Herculano Secondary School.The proposed solution keeps special attention to the historical value, assuming the elimination of buildings without architectural quality that were carried out.In this sense and respect for the original design, it is proposed to open, at the level of floor 0, all communication spans, also altered, between the galleries/corridors and exterior spaces. (English)
    8 July 2021
    0 references
    Porto, Bonfim
    0 references

    Identifiers

    NORTE-08-5673-FEDER-000160
    0 references