Energy Efficiency in Public Lighting in Vale de Cambra 2nd Phase (Q2894574)
Jump to navigation
Jump to search
Project Q2894574 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy Efficiency in Public Lighting in Vale de Cambra 2nd Phase |
Project Q2894574 in Portugal |
Statements
94,351.0 Euro
0 references
99,317.0 Euro
0 references
95.0 percent
0 references
1 January 2020
0 references
31 December 2020
0 references
MUNICÍPIO DE VALE DE CAMBRA
0 references
Efetuado um reconhecimento e análise da rede de IP do Município, e tendo como prioridade realizar uma intervenção que maximize a eficiência energética através da redução do consumo de energia elétrica efetivo com o mínimo de investimento possível, efetuou-se o estudo luminotécnico que consubstanciam as opções técnico- lumínicas, propondo-se a troca integral de luminárias ineficientes por luminárias nova equipada com LEDs. (Portuguese)
0 references
Acknowledgment and analysis of the IP network of the Municipality was carried out, and with the priority of conducting an intervention that maximises energy efficiency by reducing the effective electric energy consumption with the minimum possible investment, the luminotechnical study was carried out, constituting the technical and luminic options, proposing the integral exchange of inefficient luminaires for new luminaires equipped with LEDs. (English)
8 July 2021
0 references
Une reconnaissance et une analyse du réseau IP de la commune ont été réalisées, et avec la priorité de mener une intervention qui maximise l’efficacité énergétique en réduisant la consommation réelle d’électricité avec le minimum d’investissement possible, l’étude luminotechnique a été réalisée, qui constituent les options d’éclairage technique, proposant l’échange intégral de luminaires inefficaces pour les nouveaux luminaires équipés de LED. (French)
5 December 2021
0 references
Vale de Cambra
0 references
Identifiers
NORTE-03-1203-FEDER-000332
0 references