Sustainable Urban Mobility of the Vila Centre (Q2877491)

From EU Knowledge Graph
Revision as of 23:11, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2877491 in Portugal
Language Label Description Also known as
English
Sustainable Urban Mobility of the Vila Centre
Project Q2877491 in Portugal

    Statements

    0 references
    342,868.0 Euro
    0 references
    403,374.0 Euro
    0 references
    85.0 percent
    0 references
    16 December 2019
    0 references
    30 November 2022
    0 references
    MUNICÍPIO DE PEDRÓGÃO GRANDE
    0 references
    Q2991133 (Deleted Item)
    0 references

    39°55'1.06"N, 8°8'44.02"W
    0 references
    Intervenção nas vias municipais que interligam polos geradores, áreas residenciais, zonas económicas, serviço público, espaços verdes, outros eixos de ligação relevantes. Planeada para sustentabilidade dos modos suaves e mudança de padrão nas deslocações diárias. É reconfiguração essencial para a melhoria da vida e eixo de viragem na qualidade ambiental. Serão criados 1970m2 de ciclovia com 2600m lineares e 8200m2 de passeios com 4660m lineares. (Portuguese)
    0 references
    Intervention in municipal roads interconnecting generating poles, residential areas, economic zones, public service, green spaces and other relevant connecting axes. Planned for the sustainability of smooth modes and change of pattern in daily travels. It is essential for improving life and turning axis in environmental quality. 1970 m² of bike path with 2600 linear m and 8200 m² of walks with 4660 linear m will be created. (English)
    7 July 2021
    0 references
    Intervention sur les routes municipales qui relient les pôles de production, les zones résidentielles, les zones économiques, le service public, les espaces verts, d’autres axes de connexion pertinents. Prévu pour la durabilité des modes de transport fluides et le changement de modèle dans les déplacements quotidiens. Il s’agit d’une reconfiguration essentielle pour l’amélioration de la vie et d’un axe de rotation de la qualité environnementale. 1 970 m² de piste cyclable seront créés avec 2 600 m linéaires et 8 200 m² de trajets avec 4 660 m linéaires. (French)
    5 December 2021
    0 references
    Pedrógão Grande
    0 references

    Identifiers

    CENTRO-06-1406-FEDER-000082
    0 references