CONSTRUCTION OF CELL SCHOOL/EB1/JI (Q2870979)

From EU Knowledge Graph
Revision as of 22:40, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2870979 in Portugal
Language Label Description Also known as
English
CONSTRUCTION OF CELL SCHOOL/EB1/JI
Project Q2870979 in Portugal

    Statements

    0 references
    871,486.0 Euro
    0 references
    1,025,277.0 Euro
    0 references
    85.0 percent
    0 references
    15 April 2016
    0 references
    31 December 2019
    0 references
    MUNICÍPIO DE ALCOBAÇA
    0 references
    0 references

    39°32'23.57"N, 9°2'7.84"W
    0 references
    A operação consiste na construção de raiz do CE de Cela, para o ensino pré-escolar e 1º ciclo, com 5 salas de aulas, espaços comuns, infraestruturas básicas e arranjos exteriores. Colocação de mobiliário e equipamento informático adequados, servindo uma população escolar de mais de100 alunos, de várias EB1’s e JI. O reordenamento da rede permitirá o fecho de 4 escolas sem condições de funcionamento e isoladas e o fim dos regimes duplos. (Portuguese)
    0 references
    The operation consists of building the root of CE of Cela, for pre-school education and 1st cycle, with 5 classrooms, common spaces, basic infrastructure and external arrangements. Placement of suitable furniture and computer equipment, serving a school population of more than 100 pupils, several EB1s and JI. The redevelopment of the network will allow the closure of 4 schools without operating and isolated conditions and the end of double schemes. (English)
    7 July 2021
    0 references
    L’opération consiste en la construction fondamentale de CE Cela, pour l’éducation préscolaire et le 1er cycle, avec 5 salles de classe, des espaces communs, des infrastructures de base et des aménagements extérieurs. Mise en place d’un mobilier et d’équipements informatiques appropriés, au service d’une population scolaire de plus de 100 élèves, de plusieurs EB1 et JI. La réorganisation du réseau permettra la fermeture de 4 écoles sans conditions de fonctionnement et isolées et la fin des doubles programmes. (French)
    4 December 2021
    0 references
    Alcobaça, Cela
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000057
    0 references