New access road for special transports in the Port of Arinaga (Q3225335)

From EU Knowledge Graph
Revision as of 12:48, 21 October 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q3225335 in Spain
Language Label Description Also known as
English
New access road for special transports in the Port of Arinaga
Project Q3225335 in Spain

    Statements

    0 references
    536,221.2 Euro
    0 references
    630,848.47 Euro
    0 references
    85.0 percent
    0 references
    1 March 2021
    0 references
    31 July 2021
    0 references
    AUTORIDAD PORTUARIA DE LAS PALMAS
    0 references
    0 references

    27°54'17.82"N, 15°26'40.24"W
    0 references
    35002
    0 references
    Mejorar la seguridad y la fluidez en el acceso y la salida de de vehículos de transporte del muelle de Arinaga. _x000D_ _x000D_ Construcción de un vial que va a permitir la conexión entre la zona de atraque donde se realiza la descarga de los buques y el vial principal que se encuentra situado en el interior del Puerto de Arinaga, de manera que los vehículos de transporte puedan maniobrar adecuadamente. (Spanish)
    0 references
    Improve security and fluidity in the access and departure of transport vehicles from the Arinaga dock._x000D_ _x000D_ Construction of a road that will allow the connection between the docking area where the ships are unloaded and the main road that is located inside the Port of Arinaga, so that the transport vehicles can maneuver adequately. (English)
    0 references
    Agüimes
    0 references

    Identifiers

    Nuevo-Vial-Tte-Esp-Pto-ARINAGA
    0 references