Until RES 2016 — DOLB Trebnje — Centre Komunala Trebnje (Q3271248)

From EU Knowledge Graph
Revision as of 14:28, 20 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying budgets in slovenia one item from slovenia)
Jump to navigation Jump to search
Project Q3271248 in Slovakia
Language Label Description Also known as
English
Until RES 2016 — DOLB Trebnje — Centre Komunala Trebnje
Project Q3271248 in Slovakia

    Statements

    0 references
    347,764.26 Euro
    0 references
    347,764.26 Euro
    0 references
    100.0 percent
    0 references
    28 December 2016
    0 references
    15 May 2019
    0 references
    KOMUNALA TREBNJE D.O.O.
    0 references
    0 references
    0 references

    45°54'19.91"N, 15°1'27.01"E
    0 references
    8210
    0 references
    Namen izgradnje DOLB Trebnje - Center je povečati proizvodnjo energije iz obnovljivih virov in s tem delež obnovljivih virov energije v bilanci končne rabe energije. Cilj operacije je izgradnja daljinskega sistema v dolžini 1.129 m. Predvidena je vgradnja kotla moči 750kW (Fröling Lambdamat 750) + 350kW (Fröling TI 350), predvidena prodana količina toplote po zaključku operacije je 1.719.000 kWh na leto. (Slovenian)
    0 references
    The purpose of the construction of DOLB Trebnje — Centre is to increase the production of energy from renewable sources and thus the share of renewable energy sources in the final energy consumption balance. The aim of the operation is to build a remote system with a length of 1.129 m. It is planned to install a 750 kW boiler (Fröling Lambdamat 750) + 350 kW (Fröling TI 350), the estimated amount of heat sold after the completion of the operation is 1 719 000 kWh per year. (English)
    12 October 2021
    0 references

    Identifiers

    OP20.01366
    0 references