Renovation of the workshop building of the IES Plurilingüe Antón Losada Diéguez de A Estrada (Q3235953)

From EU Knowledge Graph
Revision as of 12:38, 12 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3235953 in Spain
Language Label Description Also known as
English
Renovation of the workshop building of the IES Plurilingüe Antón Losada Diéguez de A Estrada
Project Q3235953 in Spain

    Statements

    0 references
    18,676,966.4 Euro
    0 references
    23,346,208.0 Euro
    0 references
    80.0 percent
    0 references
    1 July 2020
    0 references
    31 December 2021
    0 references
    SECRETARIA GENERAL TECNICA DE LA CONSELLERIA DE CULTURA, EDUCACION Y ORDENACION UNIVERSITARIA
    0 references
    0 references
    0 references

    43°6'46.62"N, 7°27'43.88"W
    0 references
    36017
    0 references
    Se actúa en dos naves. En una de las naves que alberga los ciclos formativos se crea un forjado de 75,70 m2 en el que se sitúa un aula y se modifica la distribución del aula-taller de 130,60m2. En otra de las naves se crea un aula de 47,15 m2. En ambas naves se modifican y acondicionan las zonas de vestuarios y aseos. (Spanish)
    0 references
    Works take place in two warehouses. In the one that holds the formative courses, a 75.70 m2 slab is created to house a classroom and the distribution of the 130.60 m2 classroom-workshop is modified. In the other one, a 47.15 m2 classroom is created. In both warehouses the changing rooms and toilets are modified and conditioned. (English)
    0 references
    Estrada, A
    0 references

    Identifiers

    071-2020000018
    0 references