Agglomeration Tornaža – sewerage and WWTP (Q3100614)

From EU Knowledge Graph
Revision as of 12:55, 27 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q3100614 in Slovakia
Language Label Description Also known as
English
Agglomeration Tornaža – sewerage and WWTP
Project Q3100614 in Slovakia

    Statements

    0 references
    9,358,517.0 Euro
    0 references
    11,010,020.0 Euro
    0 references
    85.0 percent
    0 references
    1 October 2017
    0 references
    1 July 2021
    0 references
    Stredoslovenská vodárenská spoločnosť, a.s.
    0 references
    0 references
    0 references

    48°43'27.16"N, 19°7'44.08"E
    0 references
    Cieľom projektu je zlepšenie odvádzania a čistenia komunálnych odpadových vôd v aglomerácii Tornaľa a mestskej časti  Starňa. Aglomerácia Tornaľa je zaradená v Prílohe č. 7 Výzvy a nie je v súlade s požiadavkami vyplývajúcimi zo smernice Rady 91/271/EHS.V rámci projektu bude dobudovaná kanalizačná sieť v meste Tornaľa, vybudovaná kanalizačná sieť v mestskej časti Starňa s odvedením odpadových vôd do novovybudovanej čistiarni odpadových vôd v Tornali. Ciele projektu budú zabezpečené prostredníctvom 2 hlavných aktivít projektu a to:1. Stoková sieť2. Čistiareň odpadových vôdV meste Tornaľa bude vybudovaná nová čistiareň odpadových vôd s kapacitou 7450 EO. Celková dĺžka novovybudovaqných kanalizačných sietí bude 21,775 km. (Slovak)
    0 references
    The aim of the project is to improve the collection and treatment of urban waste water in the agglomeration of Tornaľa and the city district of Starňa. The agglomeration of Tornaľa is included in Annex 7 Challenges and does not comply with the requirements of Council Directive 91/271/EEC.The project will complete the sewerage network in Tornaľa, built a sewerage network in the municipality of Starňa with the draining of waste water to the newly built waste water treatment plant in Tornala. The objectives of the project will be ensured through 2 main activities of the project, namely:1. Sewer network2. Wastewater treatment plantIn Tornaľa, a new waste water treatment plant with a capacity of 7450 EO will be built. The total length of the newly built sewerage networks will be 21.775 km. (English)
    28 September 2021
    0 references

    Identifiers

    310011A107
    0 references