Reduction of energy intensity of the building Municipal Office in Bojnice (Q3100705)
Jump to navigation
Jump to search
Project Q3100705 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of energy intensity of the building Municipal Office in Bojnice |
Project Q3100705 in Slovakia |
Statements
174,879.66 Euro
0 references
205,740.78 Euro
0 references
85.0 percent
0 references
1 August 2020
0 references
1 February 2021
0 references
MESTO BOJNICE
0 references
Projekt " Zníženie energetickej náročnosti objektu Mestský úrad v Bojniciach" rieši sanáciu obvodového plášťa mestského úradu, ktorá predstavuje zateplenie stien, výmenu výplní okenných otvorov a otvorov zasklených stien, sanáciu strechy a výmenu svietidiel. Nakoľko pri zateplení bude potrebné zdemontovať zvody bleskozvodovej sústavy, bude aj bleskozvod realizovaný nanovo. Sanácia šikmej strešnej konštrukcie objektu predstavuje, okrem výmeny krytiny, jej zateplenie na úrovni stropnej konštrukcie najvyššieho podlažia, plochá strecha bude zateplená novou vrstvou tepelnej izolácie a následne novou hydroizolačnou vrstvou.V rámci interiéru budú vymenené svietidlá za energeticky menej náročné a bude vykonané hydraulické vyváženie vykurovacej sústavy. Na vykrytie potreby elektrickej energie pre serverovňu úradu , budú na plochej streche inštalované fotovoltické panely. Uvedenými opatreniami dosiahneme zlepšenie tepelnotechnických vlastností budovy - t.j. zvýšenie tepelného odporu stavebnej konštrukcie a zníženie súčiniteľa prechodu tepla . Znížením energetickej náročnosti budovy dosiahneme zníženie množstva emisií a zlepšenie kvality ovzdušia v našom kúpeľnom meste. Prídavným efektom vykonaných opatrení je zníženie hlučnosti v objekte. (Slovak)
0 references
The project “Reducing the energy intensity of the building Municipal Office in Bojnice” deals with the remediation of the perimeter envelope of the municipal authority, which represents insulation of the walls, replacement of the fillings of window openings and openings of glazed walls, restoration of the roof and replacement of luminaires. Since it will be necessary to disassemble lightning conduction during insulation, the lightning rod will also be re-implemented. Remediation of the sloping roof structure of the building represents, in addition to the replacement of the covering, its insulation at the level of the ceiling structure of the highest floor, the flat roof will be insulated with a new layer of thermal insulation and subsequently a new waterproofing layer.In the interior, the luminaires will be replaced with less energy-intensive and hydraulic balancing of the heating system will be carried out. Photovoltaic panels will be installed on a flat roof to cover the power needs for the office server room. These measures will improve the thermal properties of the building – i.e. increasing the thermal resistance of the building structure and reducing the heat transfer coefficient. By reducing the energy intensity of the building, we will reduce emissions and improve air quality in our spa town. The additional effect of the measures taken is to reduce noise in the object. (English)
28 September 2021
0 references