Improvement of energy efficiency improvement measures at Andrejs Eglītis Laudons Secondary School (Q3057185)

From EU Knowledge Graph
Revision as of 09:37, 27 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying co-finance rate with the percentage)
Jump to navigation Jump to search
Project Q3057185 in Latvia
Language Label Description Also known as
English
Improvement of energy efficiency improvement measures at Andrejs Eglītis Laudons Secondary School
Project Q3057185 in Latvia

    Statements

    0 references
    0 references
    500,000.0 Euro
    0 references
    1,063,481.75 Euro
    0 references
    47.02 percent
    0 references
    30 April 2021
    0 references
    31 December 2022
    0 references
    Madonas novada pašvaldība
    0 references
    0 references

    56°43'38.82"N, 26°12'57.24"E
    0 references
    Projekta īstenošana ir paredzēta Madonas novada Andreja Eglīša Ļaudonas vidusskolā. Projekta mērķis -samazināt primārās enerģijas patēriņu Andreja Eglīša Ļaudonas pamatskolā, sekmējot energoefektivitātes paaugstināšanu un pašvaldību izdevumu samazināšanos par siltumapgādi un veicot ieguldījumus pašvaldības ēkā atbilstoši Madonas novada attīstības programmā noteiktajām prioritātēm. Projekta ietvaros paredzēts veikt ēkas fasādes siltināšanu, jumta atjaunošanu un siltināšanu, ēkas cokola siltināšanu, izbūvēt skolas daļā ventilācijas sistēmu ar rekuperācijas iekārtām, modernizēt apkures sistēmu un nomainīt luminiscētos gaismekļus uz LED tipa apgaismojumu un uzstādīt saules paneļus. Paneļu saražotā enerģija pēc prioritātes tiek nodota karstā ūdens sagatavošanai un ēkas pašpatēriņam - apgaismojums, ventilācijas sistēmas darbībai.Ar projekta palīdzību, veicot ēkas siltināšanu, tiek plānots novērst siltumnoplūdi un mitruma uzkrāšanos ēkas konstrukcijās. Energoefektivitātes pasākumu uzlabošanas rezultātā tiks samazināti siltumenerģijas zudumi, tādā veidā samazinot kopējās siltumenerģijas izmaksas, kā arī CO2 emisiju daudzumu gaisā, tādā veidā paaugstinot ēkas vispārīgo stāvokli, veicinot tās ilgmūžību.Projektā plānotie rezultāti pēc energoefektivitātes uzlabošanas pasākumu ieviešanas CO2 samazinājums 108 311,70 kg/gadā, primārās enerģijas ietaupījums - 426983.16 kWh/gadā, no atjaunojamiem energoresursiem saražotā papildjauda 0,02 MW. Projekta īstenošanas termiņš 31.12.2022. Projekta kopējās izmaksas 1176522.44 EUR, ERAF - 500000,00 EUR, pašvaldības līdzfinansējums 541422.93.00 EUR, valsts budžeta dotācija 22058.82 EUR, neattiecināmās izmaksas - 113040.69 EUR. (Latvian)
    0 references
    The implementation of the project is planned at the Andrejs Eglītis Laudons Secondary School of Madona region. The aim of the project is to reduce primary energy consumption at Andrejs Eglītis Eglītis elementary school, promoting energy efficiency and reduction of municipal expenditure on heating and investing in municipal building in accordance with the priorities set out in Madona Local Development Programme. Within the project it is planned to perform the insulation of the facade of the building, renovation and insulation of the roof, the insulation of the base of the building, the construction of a ventilation system in the school part with recuperation equipment, the modernisation of the heating system and the replacement of fluorescent luminaires to LED-type lighting and the installation of solar panels. The energy produced by panels is transferred to the preparation of hot water and to the building’s own consumption – lighting, ventilation system operation.With the help of the project, during the insulation of the building, it is planned to prevent heat leakage and moisture accumulation in the building structures. The improvement of energy efficiency measures will reduce heat losses, thus reducing the overall costs of thermal energy, as well as the amount of CO2 emissions into the air, thus increasing the general condition of the building, contributing to its longevity.The planned results of the project after the introduction of energy efficiency improvement measures 108311.70 kg/year CO2 reduction, primary energy savings 426983.16 kWh/year, additional energy produced from renewable energy sources 0.02 MW. Project implementation deadline 31.12.2022. Total cost of the project EUR 1176522.44, ERDF – EUR 500000,00, municipality co-financing EUR 541422.93.00, state budget grant EUR 22058.82, ineligible costs – EUR 113040.69. (English)
    15 July 2021
    0 references
    Skolas iela 2, Ļaudona, Ļaudonas pag., Madonas nov., LV-4862
    0 references

    Identifiers

    4.2.2.0/20/I/016
    0 references