Modernisation and extension of the community centre in Wicimice (Q2719015)

From EU Knowledge Graph
Revision as of 12:34, 4 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q2719015 in Poland
Language Label Description Also known as
English
Modernisation and extension of the community centre in Wicimice
Project Q2719015 in Poland

    Statements

    0 references
    567,796.51 zloty
    0 references
    126,221.16 Euro
    0.2223 Euro
    0 references
    873,533.1 zloty
    0 references
    194,186.41 Euro
    0.2223 Euro
    0 references
    65.0 percent
    0 references
    31 March 2021
    0 references
    30 September 2022
    0 references
    GMINA PŁOTY
    0 references
    0 references

    53°48'11.2"N, 15°15'59.0"E
    0 references
    Przedmiotem projektu jest modernizacja i rozbudowa świetlicy wiejskiej w miejscowości Wicimice wraz z zagospodarowaniem terenu. W ramach inwestycji przewidziano rozbudowę świetlicy poprzez powiększenie istniejącej sali głównej oraz wykonanie nowej kuchni i toalety. Dodatkowo zaplanowano wykonanie nowego pokrycia dachowego. Po rozbudowie cały budynek zostanie ocieplony, położone zostaną tynki zewnętrzne i wewnętrzne. Projekt przewiduje także wykonanie nowego systemu ogrzewania w całym obiekcie. Ponadto przewiduje się także modernizację instalacji elektrycznej wewnętrznej. Rozbudowa i modernizacja pozwoli na dostosowanie obiektu do obowiązujących przepisów BHP i p.poż.oraz wymagań technicznych funkcjonowania obiektów użyteczności publicznej. Projekt będzie realizowany w formule "Zaprojektuj i wybuduj". Realizację projektu podzielono na zadania: 1. Przygotowanie dokumentacji projektu; 2.Rozbudowa i modernizacja świetlicy wiejskiej; 3. Zarządzanie i nadzór nad projektem; 4. Promocja projektu. Okres realizacji projektu: II-XII 2020r. Bezpośrednio po zakończeniu realizacji projektu możliwe będzie wykorzystanie pełnej funkcjonalności infrastruktury poddanej rewitalizacji w ramach projektu. Przedsięwzięcie nie wymaga dodatkowych działań w celu jego pełnego wykorzystania. Za realizację projektu odpowiedzialny będzie Wnioskodawca – Gmina Płoty, która jednocześnie będzie zarządzała projektem. Wnioskodawca powoła zespół zarządzający projektem, w tym: Kierownika projektu oraz Specjalistę ds. zamówień publicznych i rozliczenia projektu. Obsługa księgowa projektu prowadzona będzie przez Skarbnika, który współpracować będzie z kierownikiem projektu. Kierownik wraz z zespołem dysponuje odpowiednim zapleczem oraz zasobami technicznymi zapewniającymi sprawną realizację oraz rozliczenie projektu. Do realizacji projektu w fazie inwestycyjnej zostaną zaangażowani mieszkańcy obszaru rewitalizacji. (Polish)
    0 references
    The object of the project is the modernisation and extension of the rural community centre in Wicimice, together with the development of the area. As part of the investment, it was planned to expand the common room by enlarging the existing main hall and making a new kitchen and toilet. In addition, a new roofing material is planned. After the extension, the entire building will be insulated, external and internal plasters will be placed. The project also provides for the implementation of a new heating system in the entire facility. In addition, modernisation of the internal electricity system is also envisaged. Extension and modernisation will make it possible to adapt the facility to the applicable health and safety regulations and the technical requirements of the operation of public utilities. The project will be implemented in the formula “Design and Build”. The implementation of the project was divided into tasks: 1. Preparation of the project documentation; 2.Expansion and modernisation of the community centre; 3. Project management and supervision; 4. Promotion of the project. Duration of the project: II-XII 2020 Immediately after the completion of the project, it will be possible to use the full functionality of the infrastructure revitalised within the project. The project does not require additional measures to make full use of it. The project will be implemented by the Applicant – the Municipality of Płoty, who will manage the project at the same time. The applicant shall set up a project management team, including: Project Manager and Specialist in Public Procurement and Project Settlement. The project’s accounting service will be carried out by the Treasurer, who will cooperate with the project manager. The manager and the team shall have adequate facilities and technical resources to ensure the smooth implementation and settlement of the project. Residents of the revitalisation area will be involved in the implementation of the project during the investment phase. (English)
    8 July 2021
    0 references
    L’objet du projet est la modernisation et l’extension du centre communautaire rural de Wicimice, ainsi que le développement de la zone. Dans le cadre de l’investissement, il était prévu d’agrandir la salle commune en élargissant la salle principale existante et en faisant une nouvelle cuisine et des toilettes. En outre, un nouveau matériau de toiture est prévu. Après l’extension, l’ensemble du bâtiment sera isolé, des plâtres externes et internes seront placés. Le projet prévoit également la mise en place d’un nouveau système de chauffage dans l’ensemble de l’installation. En outre, la modernisation du réseau électrique interne est également envisagée. L’extension et la modernisation permettront d’adapter l’installation aux réglementations applicables en matière de santé et de sécurité et aux exigences techniques de l’exploitation des services publics. Le projet sera mis en œuvre dans la formule «Design and Build». La mise en œuvre du projet a été divisée en tâches: 1. Préparation de la documentation du projet; 2.Expansion et modernisation du centre communautaire; 3. La gestion et la supervision du projet; 4. Promotion du projet. Durée du projet: II-XII 2020 Immédiatement après l’achèvement du projet, il sera possible d’utiliser toute la fonctionnalité de l’infrastructure revitalisée dans le cadre du projet. Le projet n’exige pas de mesures supplémentaires pour en tirer pleinement parti. Le projet sera mis en œuvre par la requérante — la municipalité de Płoty, qui gérera le projet en même temps. Le demandeur met en place une équipe de gestion de projet comprenant: Gestionnaire de projet et spécialiste des marchés publics et du règlement de projets. Le service comptable du projet sera assuré par le trésorier, qui coopérera avec le chef de projet. Le gestionnaire et l’équipe disposent d’installations et de ressources techniques adéquates pour assurer la bonne exécution et le règlement du projet. Les résidents de la zone de revitalisation participeront à la mise en œuvre du projet au cours de la phase d’investissement. (French)
    4 December 2021
    0 references

    Identifiers

    RPZP.09.03.00-32-0064/19