Execution of thermomodernisation works with installation of the RES system at Doni Cor Sp. z o. o. Rehabilitation Centre in Brzeg. (Q2709491)
Jump to navigation
Jump to search
Project Q2709491 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Execution of thermomodernisation works with installation of the RES system at Doni Cor Sp. z o. o. Rehabilitation Centre in Brzeg. |
Project Q2709491 in Poland |
Statements
443,698.49 zloty
0 references
682,613.08 zloty
0 references
65.0 percent
0 references
1 February 2021
0 references
30 November 2022
0 references
OŚRODEK REHABILITACJI I ODNOWY BIOLOGICZNEJ DONI COR SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Celem realizacji projektu jest zwiększenie efektywności energetycznej budynku Ośrodka Rehabilitacji i Odnowy Biologicznej w Brzegu ul. Kamienna 4 oraz obniżenie kosztów eksploatacji poprzez wykonanie głębokiej termomodernizacji budynku wraz z wymianą oświetlenia na energooszczędne (typu LED) i zastosowaniem paneli fotowoltaicznych (PV) do produkcji energii elektrycznej na bieżące potrzeby Wnioskodawcy. Zgodnie z audytem energetycznym na podstawie dokonanej oceny jako optymalny wariant przedsięwzięcia termomodernizacyjnego w rozpatrywanym budynku ocenia się wariant obejmujący usprawnienia: 1. Modernizacja instalacji ciepłej wody (cwu);2.Docieplenie stropodachu i poddasza w Bud. Głównym; 3. Docieplenie styropapą dachu dobudówki/łącznika połączonej z salą gimnastyczną; 4. Docieplenie styropianem ściany zewnętrznej dobudówki/łącznika połączonej z salą gimnastyczną 5. Wymiana stolarki okiennej. W ramach projektu zgodnie z audytem energetycznym przewiduje się zastosowanie instalacji fotowoltaicznej na dachu budynku do produkcji energii elektrycznej, dodatkowo wymianę oświetlenia na oprawy energooszczędne typu LED. Energia elektryczna z OZE będzie służyła na bieżące potrzeby przychodni. Wnioskodawca zaplanował na zakończenie przedmiotowego projektu wykonanie audytu energetycznego ex post, stanowiącego ocenę zgodności stanu osiągniętego w wyniku realizacji projektu ze stanem przedstawionym w audycie energetycznym ex ante, stanowiącym załącznik do wniosku o dofinansowanie. Bezpośrednimi produktami realizowanego projektu będą: Liczba przedsiębiorstw, które w wyniku wsparcia poprawiły efektywność energetyczną – 1szt.; Liczba zmodernizowanych energetycznie budynków – 1szt.; Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 1szt.; Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych –0,03 MWe; Pozostałe niewykazane wskaźniki obligatoryjne przyjmują wartość = 0. Powierzchnia użytkowa budynków poddanych termomodernizacji - 1305,17 m kw. (Polish)
0 references
The aim of the project is to increase the energy efficiency of the building of the Rehabilitation and Rehabilitation Centre in Brzeg ul. Stone 4 and reduction of operating costs by carrying out deep thermal renovation of the building together with the replacement of lighting with energy saving (LED type) and the use of photovoltaic panels (PV) to produce electricity for the current needs of the Applicant. According to the energy audit, on the basis of the assessment made as an optimal option for the thermal modernisation project in the building concerned, the option including improvements is assessed: 1. Modernisation of the hot water system (the sow);2.The warming of the roof and the attic in Bud. The principal; 3. Warming with the Styropapa roof of the add-on/connector connected to the gym; 4. Polystyrene insulation of the outer wall of the add-on/connector connected to the gym 5. Replacement of window joinery. The project, in accordance with the energy audit, provides for the use of photovoltaic installations on the roof of the building for the production of electricity, in addition to replacing lighting with energy-efficient LED luminaires. Electricity from RES will serve the current needs of the clinic. At the end of the project, the applicant planned to carry out an ex-post energy audit, assessing the compliance of the project with the state set out in the ex ante energy audit annexed to the application for funding. The direct products of the project will be: Number of enterprises that have improved energy efficiency as a result of the support – 1 item; Number of energy-modified buildings – 1 item; Number of RES electricity generation units built – 1 pcs; Additional renewable electricity generation capacity – 0.03 MWe; Other mandatory indicators not reported are = 0. Usable area of buildings subjected to thermomodernisation – 1305.17 sq m (English)
7 July 2021
0 references
L’objectif du projet est d’accroître l’efficacité énergétique de la construction du Centre de réhabilitation et de réadaptation à Brzeg ul. Pierre 4 et réduction des coûts d’exploitation grâce à la rénovation thermique profonde du bâtiment, au remplacement de l’éclairage par des économies d’énergie (type LED) et à l’utilisation de panneaux photovoltaïques (PV) pour produire de l’électricité pour répondre aux besoins actuels de la requérante. Selon l’audit énergétique, sur la base de l’évaluation effectuée en tant qu’option optimale pour le projet de modernisation thermique dans le bâtiment concerné, l’option, y compris les améliorations, est évaluée: 1. Modernisation du système d’eau chaude (la truie);2.Le réchauffement du toit et du grenier à Bud. Le commettant; 3. Chauffage avec le toit Styropapa de l’add-on/connecteur connecté à la salle de gym; 4. Isolation en polystyrène de la paroi extérieure de l’add-on/connecteur relié à la salle de sport 5. Remplacement de la menuiserie des fenêtres. Le projet, conformément à l’audit énergétique, prévoit l’utilisation d’installations photovoltaïques sur le toit du bâtiment pour la production d’électricité, en plus de remplacer l’éclairage par des luminaires LED économes en énergie. L’électricité produite à partir de sources d’énergie renouvelables répondra aux besoins actuels de la clinique. À la fin du projet, la requérante envisageait de réaliser un audit énergétique ex post, en évaluant la conformité du projet avec l’état indiqué dans l’audit énergétique ex ante annexé à la demande de financement. Les produits directs du projet seront les suivants: Nombre d’entreprises ayant amélioré l’efficacité énergétique grâce au soutien — 1 poste; Nombre de bâtiments modifiés par l’énergie — 1 poste; Nombre d’unités de production d’électricité SER construites — 1 PC; Capacité supplémentaire de production d’électricité renouvelable — 0,03 MWe; Les autres indicateurs obligatoires non déclarés sont = 0. Surface utilisable des bâtiments soumis à la thermomodernisation — 1 305,17 m² (French)
4 December 2021
0 references
Identifiers
RPOP.03.04.00-16-0001/20
0 references