Revitalisation of urban areas in Szepietów (Q2711353)
Jump to navigation
Jump to search
Project Q2711353 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Revitalisation of urban areas in Szepietów |
Project Q2711353 in Poland |
Statements
293,815.15 zloty
0 references
675,437.15 zloty
0 references
43.5 percent
0 references
29 July 2020
0 references
28 December 2020
0 references
GMINA SZEPIETOWO
0 references
Projekt obejmuje: Zadanie 1. Zagospodarowanie terenu przy stawach (na „gliniankach”) Zadanie 2: Zagospodarowanie terenu w centrum miasta przy zabytkowym dworcu- roboty budowlane Zagospodarowanie terenu w centrum miasta przy zabytkowym dworcu- roboty elektryczne Zadanie 3 Nadzór inwestorski (zagospodarowanie terenu przy stawach) Zadanie 4 Nadzór inwestorski (zagospodarowanie terenu w centrum miasta przy zabytkowym dworcu) Celem projektu jest poprawa jakości życia mieszkańców oraz wzrost aktywności społecznej i obywatelskiej poprzez dostęp do nowoczesnej infrastruktury na cele kultury, rekreacji, sportu i integracji lokalnej społeczności oraz rozwoju przedsiębiorczości. Celem szczegółowym projektu jest ograniczenie lub eliminacja wpływu zjawisk kryzysowych i deficytów na poziom życia mieszkańców obszaru rewitalizacji: - w sferze społecznej - gospodarczej - przestrzenno – funkcjonalnej i technicznej oraz środowiskowej. Grupami docelowymi projektu są: - mieszkańcy zarówno miejscowości Szepietowo w których zlokalizowane będą inwestycje jak i całej gminy, bez względu na wiek, płeć itp. Oferta kulturalna i rekreacyjna oraz promocji przedsiębiorczości, której realizacja będzie możliwa dzięki realizacji projektu, będzie skierowana do każdego bez wyjątku członka lokalnej społeczności, - szczególną grupą docelową w ramach projektu, będą osoby defaworyzowane z terenu gminy, a zwłaszcza wymienionych miejscowości tj. osoby oraz rodziny zagrożone ubóstwem lub wykluczeniem społecznym i zawodowym. Wskaźniki: - Powierzchnia obszarów objętych rewitalizacją – 0,76 ha - Wzrost liczby osób korzystających z rewitalizowanych terenów – 2400 os./ rok - Otwarta przestrzeń utworzona lub rekultywowana na obszarach miejskich - 7 648,58 m2. (Polish)
0 references
The project includes: Activity 1. Development of the area at the ponds (on the clays) Task 2: Development of the area in the city centre at the historic station – construction works Development of the area in the city centre at the historic station- Electric works Task 3 Investor supervision (development of the area at the ponds) Task 4 Investor supervision (development of the area in the city centre at the historic station) The aim of the project is to improve the quality of life of residents and increase social and civic participation by accessing modern infrastructure for the purposes of culture, recreation, sport and integration of the local community and the development of entrepreneurship. The specific objective of the project is to reduce or eliminate the impact of crisis phenomena and deficits on the living standards of the inhabitants of the revitalisation area: in the social and economic sphere, spatial – functional, technical and environmental. The target groups of the project are: — residents of Szepietowo village where investments will be located as well as the whole municipality, regardless of age, gender, etc. The cultural and recreational offer and the promotion of entrepreneurship, the implementation of which will be possible through the implementation of the project, will be addressed to every member of the local community without exception, – a special target group within the project will be people disadvantaged from the territory of the municipality, in particular the mentioned localities, i.e. persons and families at risk of poverty or social and professional exclusion. Indicators: — Area of revitalisation – 0.76 ha – Increase in the number of people using revitalised sites – 2400 per year – Open space created or rehabilitated in urban areas – 7648.58 m². (English)
8 July 2021
0 references
Le projet comprend: Activité 1. Aménagement de la zone des étangs (sur les argiles) Tâche 2: Aménagement de la zone du centre-ville à la gare historique — travaux de construction Développement de la zone dans le centre-ville à la station historique- Travaux électriques Tâche 3 Supervision des investisseurs (développement de la zone aux étangs) Tâche 4 Supervision des investisseurs (développement de la zone du centre-ville à la station historique) L’objectif du projet est d’améliorer la qualité de vie des résidents et d’accroître la participation sociale et civique en accédant à des infrastructures modernes aux fins de la culture, des loisirs, du sport et de l’intégration de la communauté locale et du développement de l’esprit d’entreprise. L’objectif spécifique du projet est de réduire ou d’éliminer l’impact des phénomènes de crise et des déficits sur le niveau de vie des habitants de la zone de revitalisation: dans le domaine social et économique, spatial — fonctionnel, technique et environnemental. Les groupes cibles du projet sont les suivants: — les résidents du village de Szepietowo où les investissements seront situés ainsi que l’ensemble de la municipalité, quel que soit l’âge, le sexe, etc. L’offre culturelle et récréative et la promotion de l’esprit d’entreprise, dont la mise en œuvre sera possible par la mise en œuvre du projet, seront adressées à tous les membres de la communauté locale sans exception, — un groupe cible particulier au sein du projet sera des personnes défavorisées du territoire de la municipalité, en particulier les localités mentionnées, c’est-à-dire les personnes et les familles exposées au risque de pauvreté ou d’exclusion sociale et professionnelle. Indicateurs: — Surface de revitalisation — 0,76 ha — Augmentation du nombre de personnes utilisant des sites revitalisés — 2400 par an — Espace ouvert créé ou réhabilité dans les zones urbaines — 7 648,58 m². (French)
4 December 2021
0 references
Identifiers
RPPD.08.06.00-20-0346/19
0 references