Inowrocław spa – development of the endogenous potential of the region (Q2699385)

From EU Knowledge Graph
Revision as of 18:58, 21 September 2021 by DG Regio (talk | contribs) (‎Changed claim: budget (P474): 1,647,738.17 euro)
Jump to navigation Jump to search
Project Q2699385 in Poland
Language Label Description Also known as
English
Inowrocław spa – development of the endogenous potential of the region
Project Q2699385 in Poland

    Statements

    0 references
    6,300,393.37 zloty
    0 references
    1,400,577.45 Euro
    0.2223 Euro
    0 references
    7,412,227.5 zloty
    0 references
    1,647,738.17 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    11 July 2019
    0 references
    31 December 2021
    0 references
    MIASTO INOWROCŁAW
    0 references
    0 references

    52°46'53.4"N, 18°14'46.7"E
    0 references
    Projekt będzie realizowany w północnej części parku solankowego. Będzie on polegał na:1. kompleksowym remoncie tężni solankowej obejmującym: zdjęcie tarniny z segmentów wyznaczonych do remontu z nawierzchnią tarasu widokowego, wymianę drewnianych podwalin w 10% całkowitej ich ilości segmentów gdzie będzie wymieniana tarnina, wymianę wszystkich łat drewnianych i rusztu drewnianego (dotyczy łat drewnianych i rusztu drewnianego segmentów tężni przeznaczonych do wymiany tarniny), ułożenie tarniny w segmentach wyznaczonych do remontu z ułożeniem nawierzchni tarasu widokowego.2. budowie parkingu przy ul. Bocznej. Zakres zadania obejmuje: budowę drogi dojazdowej o szerokości 5,0m wraz z chodnikiem łączącym projektowany parking z ul. Boczną, budowę parkingu dla samochod6w osobowych, wyznaczenie miejsca na ustawienie kontenerów na odpady biodegradowalne, oświetlenie parkingu i drogi dojazdowej waz z montażem kamery monitoringu,odwodnienie.3. uzupełnieniu oświetlenia wokół tężni, 4. zakupie i montażu elementów malej architektury tj. ławek, leżaków betonowych, koszy na odpadki, tablicy z walorami tężni, zraszaczy, kamienia do uzupełnienia przestrzeni między tacami ociekowymi tężni a płotkiem oddzielającym od chodników,5. rekultywacji terenu zielonego wokół tężni, wraz z zagospodarowaniem placu wewnątrz tężni. (Polish)
    0 references
    The project will be implemented in the northern part of the brine park. It will consist of:1. a comprehensive refurbishment of brine thyroids, including: photo of the sloe from the segments designated for renovation with the surface of the observation terrace, replacement of wooden foundations in 10 % of the total number of segments where sloe will be replaced, replacement of all wooden patches and wooden grate (applicable to wooden patches and wood grate for the exchange of sloe), laying the sloe in the segments designated for renovation with laying the surface of the observation terrace.2. construction of a car park at ul. The sidewalk. The scope of the task includes: construction of an access road with a width of 5.0 m and a pavement linking the planned car park from ul. Lateral, construction of a parking lot for passenger cars, designation of space for setting up biodegradable waste containers, illumination of parking lot and access road vases with installation of surveillance camera, dewatering.3. to supplement lighting around the rainbows, 4. purchase and assembly of elements of small architecture i.e. benches, concrete deck chairs, waste bins, boards with the values of rainbows, sprinklers, stones to complement the space between the rainwater trays and the fence separating from the pavements,5. reclamation of the green area around the rainbows, together with the development of the square inside the tracks. (English)
    7 July 2021
    0 references

    Identifiers

    RPKP.06.05.00-04-0011/18
    0 references