Barlad bypass (Q3099094)
Jump to navigation
Jump to search
Project Q3099094 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Barlad bypass |
Project Q3099094 in Romania |
Statements
136,514,287.2 Romanian Leu
0 references
27,302,857.439999998 Euro
0.2 Euro
13 September 2021
0 references
160,605,043.8 Romanian Leu
0 references
32,121,008.760000005 Euro
0.2 Euro
13 September 2021
0 references
0.85 percent
0 references
1 October 2017
0 references
31 December 2023
0 references
COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
0 references
Obiectivul general al proiectului de constructie a variantei de ocolire Barlad este acela de a realiza o conexiune intre infrastructura existenta la profil de drum national, cu devierea traficului de tranzit in exteriorul localitatii. In mod direct, implementarea va conduce la Imbunatatirea competitivitatii economice a României prin dezvoltarea infrastructurii de transport care faciliteaza integrarea economica in UE, contribuind astfel la dezvoltarea pietii interne cu scopul de a creea conditiile pentru cresterea volumului investitiilor, promovarea transportului durabil si a coeziunii in reteaua de drumuri europene. Realizarea prezentului proiect de construire a variantei de ocolire Barlad contribuie la atingerea indicatorului de rezultat 2S11 – Timpul mediu de călătorie pe rețeaua rutieră TEN-T. (Romanian)
0 references
The general objective of the Barlad bypass project is to make a connection between the existing infrastructure at the national road profile, with the diversion of transit traffic outside the locality. Directly, implementation will lead to improving Romania’s economic competitiveness by developing transport infrastructure that facilitates economic integration in the EU, thus contributing to the development of the internal market in order to create the conditions for increasing the volume of investments, promoting sustainable transport and cohesion in the European road network. The implementation of this project to build the Barlad bypass contributes to achieving the result indicator 2S11 – Average travel time on the TEN-T road network. (English)
16 September 2021
0 references
Municipiul Bîrlad, Romania
0 references
Identifiers
119143
0 references