Reconstruction of hot water from central boiler room, Prakovce (Q3106325)

From EU Knowledge Graph
Revision as of 15:13, 15 September 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3106325 in Slovakia
Language Label Description Also known as
English
Reconstruction of hot water from central boiler room, Prakovce
Project Q3106325 in Slovakia

    Statements

    0 references
    375,650.09 Euro
    0 references
    466,646.08 Euro
    0 references
    0.81 percent
    0 references
    4 January 2021
    0 references
    9 January 2022
    0 references
    Veolia Energia Východné Slovensko, s.r.o.
    0 references

    48°42'51.52"N, 21°14'4.52"E
    0 references
    Hlavným cieľom projektu je rekonštrukcia sekundárnych rozvodov tepla v rámci účinného centralizovaného systému zásobovania teplom v obci Prakovce.Žiadateľ, Veolia Energia Východné Slovensko, s.r.o. je v 100%-nom vlastníctve Veolia Energia Slovensko, a. s., ktorá pôsobí na Slovensku už 27 rokov (od roku1992).Predmetom činnosti spoločnosti Veolia Energia Východné Slovensko, s.r.o. je výroba, rozvod a predaj tepla a teplej úžitkovej vody. Cieľ projektu je v plnom súlade s globálnym cieľom OP KŽP, Prioritnou osou 4: 4.5 Podpora využívania vysoko účinnej kombinovanej výroby tepla a elektrickejenergie na základe dopytu po využiteľnom teple, Špecifickým cieľom 4.5.1 Rozvoj účinnejších systémov CZT založených na dopyte po využiteľnom teple.Realizáciou projektu dôjde k naplneniu plánovaného výsledku špecifického cieľa prostredníctvom hlavnej aktivityA. Výstavba, rekonštrukcia a modernizácia rozvodov tepla, ktorá sa dosiahne pomocou: • výmena a modernizácia existujúcich potrubných rozvodov ÚK a TÚV s návrhom nových trás a dimenzií bezkanálových rozvodov tepla v 4 rúrkovom prevedenís využitím predizolovaných systémov• Vybavenia novými meracími a regulačnými radami v rámci hydraulického vyregulovania a optimalizácie distribúcie energie v sieti Výsledkom bude:• zníženie strát tepla o 186,9 MWh/rok na distribúcii zvýšenie účinnosti distribúcie tepla o 5,4 %• úspore primárnych energetických zdrojov o 191,4 MWh Miestom realizácie je obec Prakovce. Projekt „Rekonštrukcia teplovodov z centrálnej kotolne, Prakovce“ rieši komplexnú výmenu jestvujúcich rozvodov tepla vpôvodných trasách teplovodov s využitím predizolovaných potrubných systémov Výsledkom projektu je zvýšenie účinnosti rozvodov tepla, očakávané zníženie mernej spotreby tepla na ohrev TÚV a mernej spotreby elektriny na jednotku dodávkytepla.Projekt rieši obnovu existujúcich tepelných rozvodov na vymedzenom území v zmysle §2 písm. q) zákona č. 657/2004 Z. z. o tepelnej energetike. Rekonštrukciarozvodov nebude mať žiadne dôsledky na existujúcu infraštruktúru v danej lokalite. Nové potrubie bude v plnej miere vedené v trasách jestvujúcich teplovodov. (Slovak)
    0 references
    The main objective of the project is the reconstruction of secondary heat distribution within the efficient district heating system in the village Prakovce.The applicant, Veolia Energia Eastern Slovakia, s.r.o. is 100 % owned by Veolia Energia Slovensko, a. s., which has been operating in Slovakia for 27 years (since 1992).The subject of the activity of Veolia Energia Eastern Slovakia, s.r.o. is the production, distribution and sale of heat and hot domestic water. The objective of the project is fully in line with the global objective of the OP KŽP, Priority Axis 4: 4.5 Promoting the use of high-efficiency cogeneration based on useful heat demand, Specific objective 4.5.1 Developing more efficient CZT systems based on useful heat demand. The project implementation will meet the planned result of the specific objective through the main activityA. Construction, reconstruction and modernisation of heat distribution systems, which will be achieved by: • replacement and modernisation of existing pipelines of CEC and TÚV with the design of new routes and dimensions of channel-free heat distribution in 4 tubular versionsusing pre-insulated systems• Equipment with new measuring and regulatory councils in the framework of hydraulic control and optimisation of energy distribution in the network The result will be:• reduction of heat loss by 186,9 MWh/year on distribution, increase heat distribution efficiency by 5.4 %• primary energy saving of 191.4 MWh The place of implementation is the municipality of Prakovce. The project “Reconstruction of heat pipes from the central boiler room, Prakovce” solves the comprehensive exchange of existing heat distribution systems in the original hot-water routes using pre-insulated pipeline systems The result of the project is to increase the efficiency of heat distribution, the expected reduction of specific heat consumption for DHW heating and specific electricity consumption per unit of heat supply. The project addresses the renewal of existing heat distribution systems in the defined area in accordance with §2 (q) of Act No 657/2004 Coll. on thermal energy. Reconstruction of distributions will have no consequences for existing infrastructure on the site. The new pipeline will be fully routed in existing hot water routes. (English)
    15 September 2021
    0 references

    Identifiers

    310041Z652
    0 references