Reconstruction of the water supply in Nitra on the streets of Kalvárska and brigadier (Q3102518)
Jump to navigation
Jump to search
Project Q3102518 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the water supply in Nitra on the streets of Kalvárska and brigadier |
Project Q3102518 in Slovakia |
Statements
109,772.05 Euro
0 references
129,143.59 Euro
0 references
0.85 percent
0 references
1 December 2018
0 references
1 July 2021
0 references
Západoslovenská vodárenská spoločnos, a.s.
0 references
Ciež projektu: Zlepenie zásobovania pitnou vodou obyvatežov ulíc Kalvárska a Brigádnická v meste NitraRekontrukcia vodovodu na uliciach Kalvárska a Brigádnická je nutná z dôvodu častej poruchovosti jestvujúceho vodovodu. Rekontrukciou verejného vodovodu dochádza k výmene vodovodných potrubí po ivotnosti za nové, s lepími hydraulickými parametrami, čím sa zabezpečí významné zníenie strát vo vodovodnej sieti a dôjde k zlepeniu tlakových pomerov vodovodnej siete. Zároveň sa zníi počet porúch na vodovodnej sieti, čo výrazne ovplyvňuje hospodárnos prevádzky verejných vodovodov. Ďalej sa zabezpečí zlepenie kvalitatívnych parametrov a zdravotnej nezávadnosti pitnej vody v súlade s §13 ods. 1 poiadavkami zákona č. 442/2002 Z.z. o verejných vodovodoch a verejných kanalizáciách v znení osobitných predpisov. Nové vodovodné potrubie bude spĺňa kvalitatívne a hygienické poiadavky v súlade so smernicou 98/83/ES o kvalite vody určenej pre žudskú spotrebu a nariadením vlády č. 354/2006 Z. z. ktorou sa ustanovujú poiadavky na vodu pre žudskú spotrebu a kontrolu kvality vody určenej na žudskú spotrebu. Navrhovaný projekt po svojom dokončení a uvedení do prevádzky skvalitní stav napojenosti obyvatežov v danej oblasti na verejný vodovod, prispeje k bezproblémovému zásobovaniu obyvatežstva pitnou vodou, dôjde k zlepeniu situácie v súvislosti so zvýením počtu obyvatežov majúcich trvalý prístup ku kvalitnej pitnej vode zverejných vodovodov, zlepí sa vyuitežnos miestnych vodných zdrojov a tým sa podstatne zmenia úniky vodyMeratežné ukazovatele projektu:Počet km zrekontruovanej vodovodnej siete: 0,658 kmZvýený počet obyvatežov so zlepenou dodávkou pitnej vody: 108 osôb Projekt je v súlade so stratégiou IROP Prioritná os 4 - Zlepenie kvality ivota v regiónoch s dôrazom na ivotné prostredie, ktorá nadväzuje na tematický ciež č.6 Ochrana ivotného prostredia a presadzovania efektívnosti zdrojov, so pecifickým ciežom 4.2.1 IROP, ako aj Plánom rozvoja verejných vodovodov a verejnýchkanalizácií pre územie SR. (Slovak)
0 references
Aim of the project: Improving the drinking water supply of the inhabitants of Kalvárska streets and brigadier in NitraReconstruction of the water supply on the streets of Kalvárska and brigadier is necessary due to the frequent breakdown of the existing water supply. By reconstructing the public water supply, water pipes are replaced after life with new, with better hydraulic parameters, ensuring significant reduction of losses in the water supply network and improving pressure ratios of the water supply network. At the same time, the number of faults on the water supply network will be reduced, which significantly affects the cost-effectiveness of public water supply operations. Furthermore, the improvement of the quality parameters and health safety of drinking water in accordance with Section 13(1) of Act No 442/2002 Coll. on public water supply and public sewerage, as amended by special regulations, shall be ensured. The new water pipe will comply with the quality and hygiene requirements in accordance with Directive 98/83/EC on the quality of water intended for human consumption and Government Regulation No 354/2006 laying down requirements for water for human consumption and the control of the quality of water intended for human consumption. The proposed project, after its completion and commissioning, will improve the state of connection of the population in the area to the public water supply, will contribute to a smooth supply of drinking water, improve the situation in relation to the increase in the number of inhabitants with permanent access to quality drinking water from public water supply, poor utilisation of local water resources and thus significantly change water leakages Measurement indicators projektu:Počet km of the reconstructed water supply network: 0.658 kmIncreased number of inhabitants with improved drinking water supply: 108 persons The project is in line with the IROP Strategy Priority axis 4 – Improving the quality of life in regions with an emphasis on the environment, which follows on from thematic objective No.6 Protection of the environment and promotion of resource efficiency, with specific objective 4.2.1 IROP, as well as the Plan for the Development of Public Water Supply and Public Canalisation for the Slovak Republic. (English)
15 September 2021
0 references
Identifiers
302041Q019
0 references