Agglomeration Tornaža – sewerage and WWTP (Q3100614)

From EU Knowledge Graph
Revision as of 13:10, 15 September 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3100614 in Slovakia
Language Label Description Also known as
English
Agglomeration Tornaža – sewerage and WWTP
Project Q3100614 in Slovakia

    Statements

    0 references
    9,358,517.0 Euro
    0 references
    11,010,020.0 Euro
    0 references
    0.85 percent
    0 references
    1 October 2017
    0 references
    1 July 2021
    0 references
    Stredoslovenská vodárenská spoločnos, a.s.
    0 references
    0 references

    48°43'27.16"N, 19°7'44.08"E
    0 references
    Ciežom projektu je zlepšenie odvádzania a čistenia komunálnych odpadových vôd v aglomerácii Tornaža a mestskej časti  Starňa. Aglomerácia Tornaža je zaradená v Prílohe č. 7 Výzvy a nie je v súlade s požiadavkami vyplývajúcimi zo smernice Rady 91/271/EHS.V rámci projektu bude dobudovaná kanalizačná sie v meste Tornaža, vybudovaná kanalizačná sie v mestskej časti Starňa s odvedením odpadových vôd do novovybudovanej čistiarni odpadových vôd v Tornali. Ciele projektu budú zabezpečené prostredníctvom 2 hlavných aktivít projektu a to:1. Stoková sie2. Čistiareň odpadových vôdV meste Tornaža bude vybudovaná nová čistiareň odpadových vôd s kapacitou 7450 EO. Celková dĺžka novovybudovaqných kanalizačných sietí bude 21,775 km. (Slovak)
    0 references
    The aim of the project is to improve the drainage and treatment of urban waste water in the agglomeration of Tornaža and the city district of Starňa. The agglomeration of Tornaža is included in Annex 7 Calls and is not in line with the requirements arising from Council Directive 91/271/EEC.The project will complete the sewerage network in Tornaža, built a sewer network in the municipality of Starňa with the transfer of waste water to the newly built waste water treatment plant in Tornala. The objectives of the project will be ensured through 2 main activities of the project, namely:1. Sewer network2. A new waste water treatment plant will be built in Tornaža with a capacity of 7450 EO. The total length of the newly built sewer networks will be 21.775 km. (English)
    15 September 2021
    0 references

    Identifiers

    310011A107
    0 references