Modernisation of the road III. Class 1113 Horho ník – Malacky (Q3100759)

From EU Knowledge Graph
Revision as of 15:28, 15 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3100759 in Slovakia
Language Label Description Also known as
English
Modernisation of the road III. Class 1113 Horho ník – Malacky
Project Q3100759 in Slovakia

    Statements

    0 references
    3,468,747.06 Euro
    0 references
    6,937,494.12 Euro
    0 references
    0.5 percent
    0 references
    1 July 2018
    0 references
    1 October 2019
    0 references
    Bratislavský samosprávny kraj
    0 references

    48°9'27.36"N, 17°9'46.08"E
    0 references
    Ciežom projektu „Modernizácia cesty III. triedy 1113 Rohožník-Malacky" je rekonštrukcia cesty III/1113 Rohožník - Malacky, prostredníctvom IROP v rámci prioritnej osi č.1: Bezpečná a ekologická doprava v regiónoch. Cesta III/1113 Rohožník - Malacky s napojením na diažnicu D2, ktorá patrí do hlavnej siete TEN-T v rámci koridoru ORIENT/EAST-MED, je kžúčovou cestnou komunikáciou medzi okresným mestom Malacky a okolitými obcami. Cesta predstavuje najrýchlejšie dopravné spojenie do okresného mesta pre obce Rohožník, Sološnica, Kuchyňa, Plavecké Podhradie a Plavecký Mikuláš, teda pre približne 8,5 tisíca obyvatežov dotknutých obcí. Cesta má navyše nadregionálny význam, nakožko predstavuje najrýchlejšie napojenie na diažnicu D2 pre obce Plavecký Peter, Prievaly, Cerová, Buková, Osuské a Jablonica v Trnavskom kraji. Okrem individuálnej osobnej dopravy je cesta využívaná aj nákladnou a verejnou osobnou dopravou. Z dôvodu nevyhovujúceho šírkového usporiadania cesty III/1113 sa v roku 2011 pristúpilo k zjednosmerneniu premávky nákladnej dopravy nad 12 ton v smere Rohožník-Malacky. Vzniknutá situácia je riešená obchádzkou cez obce Pernek a Kuchyňa,čo negatívne vplýva na približne 2600 obyvatežov spomínaných obcí. Cesta III/1113 je strategickým napojením na ostatnú cestnú sie pre viaceré výrobné závody spoločností pôsobiacich v oblasti. Kžúčovou úlohou cesty III/1113 Rohožník – Malacky, je predovšetkým zabezpečenie rýchleho napojenia na TEN-T a priameho vstupu na Vnútorný trh Európskej únie. Zrekonštruovaná cesta III/1113 medzi Malackami a Rohožníkom predstavuje z hžadiska času a vzdialenosti a teda aj z hžadiska dopadu na životné prostredie najvýhodnejšie prepojenie dotknutých obcí v regióne s okresným mestom Malacky a s diažnicou D2. Modernizáciou cesty III/1113 sa znížia prevádzkové náklady na jej opravu a údržbu. Z hžadiska meratežných ukazovatežov, je ciežom projektu zrekonštruova 7,787 km cesty a získa úsporu času v cestnej doprave na ceste III/1113 Rohožník-Malacky v hodnote 20 897 EUR ku koncu realizácie projektu pričom táto hodnota v zmysle vypracovanej CBA každoročne narastá. (Slovak)
    0 references
    The objective of the project Modernisation of the road III. Class 1113 Roof-Malacky" is the reconstruction of road III/1113 Rohoník – Malacky, through IROP under priority axis No.1: Safe and clean transport in the regions. Road III/1113 Rohoník – Malacky with connection to D2 diažnica, which belongs to the main TEN-T network within the ORIENT/EAST-MED corridor, is a key road communication between the district town of Malacky and the surrounding municipalities. The road is the fastest transport connection to the district town for the villages Rohoník, Solonica, Kuchyňa, Plavecké Podhradie and Plavecký Mikulá, that is, for the 8,5 thousand inhabitants of the affected municipalities. The road has a supra-regional importance, as well as the fastest connection to the D2 diažnica for the villages Plavecký Peter, Prievaly, Cerová, Buková, Osuské and Jablonica in Trnava region. In addition to individual passenger transport, the journey is also used by freight and public passenger transport. Due to the unsatisfactory structure of road III/1113, freight traffic of more than 12 tonnes in the direction of Rohoník-Malacky was unidirectional in 2011. The situation is solved by a detour through the villages Pernek and Kuchyňa, which negatively affects the area of 2600 inhabitants of the mentioned villages. Road III/1113 is a strategic link to the other road network for several production plants of companies operating in the area. The key task of road III/1113 Malacky Roofing is, in particular, to ensure a rapid connection to the TEN-T and direct entry to the European Union’s Internal Market. The reconstructed road III/1113 between Malacky and Rohoník represents the most advantageous connection of the affected municipalities in the region with the district town Malacky and with the D2 diažnica, from the hinterland of time and thus from the impact on the environment. The modernisation of road III/1113 will reduce the operating costs for its repair and maintenance. From the demand for measurement indicators, the project aims to recontrude 7.787 km of road and will save time in road transport on road III/1113 Rohoník-Malacky worth EUR 20897 towards the end of the project implementation, and this value in terms of the CBA is growing every year. (English)
    15 September 2021
    0 references

    Identifiers

    302011F620
    0 references