No label defined (Q3106218)

From EU Knowledge Graph
Revision as of 15:12, 15 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The submitted project under the Operational Programme Quality of the Environment, calls number OPKZP-PO2-SC421-2018-46, is entirely aimed at reducing energy intensity and increasing the use of renewable energy sources in enterprises by implementing Measures No.1 (a,b,c) reconstruction and modernisation of building buildings in the field of industry and services downstream in order to reduce their energy intensity and Measures 6 modernisation and...)
Jump to navigation Jump to search
Project Q3106218 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3106218 in Slovakia

    Statements

    0 references
    185,140.08 Euro
    0 references
    370,280.15 Euro
    0 references
    0.5 percent
    0 references
    9 January 2020
    0 references
    1 January 2022
    0 references
    ZTS TEES VOS, akciová spoločnosť
    0 references

    49°3'10.73"N, 18°55'3.00"E
    0 references
    Predkladaný projekt v zmysle Operačného programu Kvalita životného prostredia, výzvy číslo OPKZP-PO2-SC421-2018-46, je v celom rozsahu zameraný na zníženie energetickej náročnosti a zvýšenie využívania obnoviteľných zdrojov energie v podnikoch realizáciou Opatrenia č.1 (a,b,c) rekonštrukcia a modernizácia stavebných objektov v oblasti priemyslu a služieb na to nadväzujúcich za účelom zníženia ich energetickej náročnosti a Opatrenia 6 modernizácia a rekonštrukcia systémov vonkajšieho osvetlenia priemyselných areálov, ktoré prispievajú k znižovaniu spotreby primárnych energetických zdrojov. Projekt bude realizovaný na adrese: Kráčiny 3, Martin, v katastrálnom území Martin, parcelné číslo: 1194/2, LV. č. 5062. Budova je v prevádzke a je napojená na všetky potrebné inžinierske siete.Strategickým cieľom projektu je zníženie energetickej náročnosti v podniku ZTS TEES VOS, a.s. Špecifickými cieľmi projektu sú: zníženie nákladov na osvetlenie,zníženie nákladov na vykurovanie,úspora energie,zníženie environmentálneho zaťaženia,zabezpečenie vhodnej teploty pracovného prostredia,modernizácia podniku.Hlavnou aktivitou projektu je:  Implementácia opatrení z energetických auditovPodmienkou podania a realizácie projektu je predloženie energetického auditu, ktorý je vypracovaný odborne spôsobilou osobou, na základe ktorého sú navrhnuté opatrenia v oblasti energetickej efektívnosti a využívania OZE. Hlavná aktivita projektu spočíva v implementácií zvolených opatrení z energetického auditu. Konkrétne ide o zateplenie strechy, rekonštrukciu a modernizáciu vykurovacieho systému, rekonštrukciu a modernizáciu osvetlenia výrobnej haly a rekonštrukciu a modernizáciu vonkajšieho osvetlenia. Realizáciou uvedených hlavných aktivít sa dosiahnu stanovené merateľné ukazovatele a celková úspora bude na úrovni 511,3 MWh/rok. Hlavným výstupom projektu bude významné zníženie spotreby energií a vyprodukovaných emisií výrobnej haly, tým pádom aj zlepšenie energetickej hospodárnosti a zníženie energetickej náročnosti spoločnosti. Zníženie spotreby energie prinesie úsporu finančných prostriedkov, ktoré budú prínosom pre žiadateľa. (Slovak)
    0 references
    The submitted project under the Operational Programme Quality of the Environment, calls number OPKZP-PO2-SC421-2018-46, is entirely aimed at reducing energy intensity and increasing the use of renewable energy sources in enterprises by implementing Measures No.1 (a,b,c) reconstruction and modernisation of building buildings in the field of industry and services downstream in order to reduce their energy intensity and Measures 6 modernisation and reconstruction of outdoor lighting systems of industrial premises, which contribute to reducing the consumption of primary energy sources. The project will be implemented at: Kráčina 3, Martin, in the cadastral area Martin, parcel number: 1194/2, LV. No 5062. The building is in operation and connected to all necessary engineering networks. The strategic objective of the project is to reduce energy intensity in the company ZTS TEES VOS, a.s. The specific objectives of the project are: reducing the cost of lighting,reducing heating costs,energy saving,reducing environmental burden,ensuring a suitable working environment temperature,upgrading the plant.The main activity of the project is:  Implementation of measures from energy audits The condition for submission and implementation of the project is the submission of an energy audit, which is prepared by a qualified person on the basis of which measures in the field of energy efficiency and use of RES are proposed. The main activity of the project consists of the implementation of selected measures from the energy audit. In particular, the roof insulation, the reconstruction and modernisation of the heating system, the reconstruction and modernisation of the production hall lighting, and the renovation and modernisation of outdoor lighting. The implementation of the above-mentioned main activities will achieve measurable indicators and the total savings will be 511,3 MWh/year. The main output of the project will be a significant reduction in energy consumption and produced emissions of the production hall, thus improving energy efficiency and reducing the company’s energy intensity. Reducing energy consumption will save money that will benefit the applicant. (English)
    15 September 2021
    0 references

    Identifiers

    310041X505
    0 references