Capital repairs, energy modernisation and efficiency – SPITAL Municipal St. Hierarch Dr. Luke ONESTI (Q2740942)

From EU Knowledge Graph
Revision as of 12:25, 15 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q2740942 in Romania
Language Label Description Also known as
English
Capital repairs, energy modernisation and efficiency – SPITAL Municipal St. Hierarch Dr. Luke ONESTI
Project Q2740942 in Romania

    Statements

    0 references
    23,772,648.71 Romanian Leu
    0 references
    4,754,529.742000001 Euro
    13 September 2021
    0 references
    27,967,821.98 Romanian Leu
    0 references
    5,593,564.396000001 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    1 September 2018
    0 references
    30 April 2023
    0 references
    SPITALUL MUNICIPAL "SFANTUL IERARH DR.LUCA" ONESTI
    0 references

    44°26'21.55"N, 26°5'51.83"E
    0 references
    Obiectivul general al proiectului este creșterea eficienței energetice a cladirii Spitalului Municipal Sf, Ierarh Dr. Luca din Municipiul Onesti, îmbunătățirea condițiilor in care se acorda asistenta medicala prin asigurarea uinor conditii mai bune de confort interior, reducerea consumurilor energetice și scăderea emisiilor poluante. Cresterea performantei energetice se va asigura prin realizarea unor lucrari de interventie care sa determine diminuarea consumurilor energetice pentru incalzirea cladirii, in conditiile asigurarii si mentinerii climatului termic interior, prin limitarea pierderilor de caldura catre mediul exterior, Obiectivul general al proiectului se va realiza în contextul îndeplinirii obiectivului general al Programului Operational Regional 2014-2020, respectiv creșterea competitivității economice și îmbunătăţirea condițiilor de viață ale comunităților locale și regionale prin sprijinirea dezvoltării mediului de afaceri, a condițiilor infrastructurale și a serviciilor, care să asigure o dezvoltare sustenabilă a regiunilor, capabile să gestioneze în mod eficient resursele, să valorifice potențialul lor de inovare și de asimilare a progresului tehnologic. Proiectul de față – prin investițiile pe care le vizează - își aduce aportul la sprijinirea tranziției către o economie cu emisii scăzute de carbon propuse de Axa 3 Axei prioritare 3 Sprijinirea tranziției către o economie cu emisii scăzute de carbon,si la obiectivul specific al prioritatii de investitii 3.1 Sprijinirea eficienței energetice, a gestionării inteligente a energiei și a utilizării energiei din surse regenerabile în infrastructurile publice, inclusiv în clădirile publice, și în sectorul locuințelor, Operatiunea B Clădiri Publice este creșterea eficienței energetice în clădirile rezidențiale, clădirile publice și sistemele de iluminat public, îndeosebi a celor care înregistrează consumuri energetice mari.si raspunde obiectivelor strategice şi priorităţilor de dezvoltare strategică stabilite de catre Municipiul Onesti. (Romanian)
    0 references
    The general objective of the project is to increase the energy efficiency of the building of St. Hierarch Dr. Luca Municipal Hospital in Onesti Municipality, to improve the conditions in which medical assistance is provided by providing better indoor comfort conditions, reducing energy consumption and reducing pollutant emissions. Increasing energy performance will be ensured by performing intervention works that will reduce the energy consumption for heating the building, in the conditions of ensuring and maintaining the indoor thermal climate, by limiting heat losses to the external environment, the general objective of the project will be achieved in the context of achieving the general objective of the Regional Operational Programme 2014-2020, namely increasing economic competitiveness and improving the living conditions of local and regional communities by supporting the development of the business environment, infrastructural conditions and services, which ensure a sustainable development of the regions, able to manage resources efficiently, to exploit their potential for innovation and assimilation of technological progress. This project – through its investments – contributes to supporting the transition to a low-carbon economy proposed by Priority Axis 3, Supporting the transition to a low-carbon economy and the specific objective of the investment priority 3.1 Supporting energy efficiency, smart energy management and renewable energy use in public infrastructures, including public buildings, and in the housing sector, Operation B Public Buildings is to increase energy efficiency in residential buildings, public buildings and public lighting systems, especially those with high energy consumption and meet the strategic objectives and priorities set by the City of Onesti. (English)
    14 September 2021
    0 references
    Municipiul Oneşti, Romania
    0 references

    Identifiers

    118007
    0 references