Revision as of 13:10, 15 September 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): On the basis of the findings of the high groundwater level – the underlying IG surveys of May 2015, a change in the design of the deep storage of gravitational sewerage was made conditional on it reaching below the groundwater level to the minimum extent possible. Project documentation of 90 % originally designed route of sewage channels, with reworking of flows – under the natural slope of the terrain, taking into account documented groundwater...)
Jump to navigation Jump to search
Project Q3100615 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3100615 in Slovakia

    Statements

    0 references
    11,400,432.56 Euro
    0 references
    13,412,273.6 Euro
    0 references
    0.85 percent
    0 references
    1 February 2017
    0 references
    1 December 2020
    0 references
    OBEC Topožníky
    0 references
    0 references

    47°58'13.76"N, 17°47'7.04"E
    0 references
    Na základe zistenia vysokej hladiny podzemných vôd - podloženými IG prieskumami z mája 2015 bola podmienená zmena návrhu v hĺbkovom uložení gravitačných kanalizačných stôk tak , aby v čo najminimálnejšom rozsahu zasahovali pod hladinu podzemných vôd. Projektová dokumentácia dodržala z 90% pôvodne navrhnuté trasovanie stôk splaškovej kanalizácie, s prepracovaním prietokov - podža prirodzeného spádu terénu , s prihliadnutím na zdokumentované hladiny podzemných vôd v zriadených sondách v rámci obce Topožníky. Projektová dokumentácia rieši v celo-obecnom meradle - odvádzanie splaškových vôd systémom gravitačných kanalizačných stôk - v kombinácii s návrhom osadenia 19 ks novo-navrhnutých prečerpávacích kanalizačných staníc, včetne výtlačných potrubí do najbližších kanalizačných šachiet - včetne napojenia IBV na celoobecnú kanalizáciu. Stavba bude slúži na odvedenie splaškových odpadových vôd zo záujmového územia obce - od nehnutežností v celoobecnom rozsahu - na budovanú čistiareň odpadových vôd v Topožníkoch. Stavba je z ekologického hžadiska významnou stavbou. (Slovak)
    0 references
    On the basis of the findings of the high groundwater level – the underlying IG surveys of May 2015, a change in the design of the deep storage of gravitational sewerage was made conditional on it reaching below the groundwater level to the minimum extent possible. Project documentation of 90 % originally designed route of sewage channels, with reworking of flows – under the natural slope of the terrain, taking into account documented groundwater levels in established probes within the village Topožníky. Project documentation on a whole-municipal scale – drainage of sewage by the system of gravity sewerage – in combination with the proposal to install 19 pcs of newly designed pumping sewer stations, including discharge pipes to the nearest sewer achets – including connections of IBV to the municipal sewerage system. The building will be used to remove sewage from the municipality’s interest area – from non-municipalities – to the built wastewater treatment plant in Topožníky. The building is an important building from the ecological hut. (English)