PRE3 – School Buildings and Spaces Recovery Program of the Municipality – EB1 of Figueira do Cavaleiros (Q2862667)

From EU Knowledge Graph
Revision as of 09:10, 20 October 2021 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 115,895.69 euro)
Jump to navigation Jump to search
Project Q2862667 in Portugal
Language Label Description Also known as
English
PRE3 – School Buildings and Spaces Recovery Program of the Municipality – EB1 of Figueira do Cavaleiros
Project Q2862667 in Portugal

    Statements

    0 references
    15 March 2017
    0 references
    29 November 2019
    0 references
    MUNICIPIO DE FERREIRA DO ALENTEJO
    0 references

    38°7'2.21"N, 8°17'0.53"W
    0 references
    A operação contempla obras da EB1 de Figueira dos Cavaleiros e visa corrigir deficiências existentes na construção e criar melhores condições para a melhoria da qualidade dos processos de aprendizagem, segurança e mobilidade. As intervenções incidirão na melhoria das condições das salas de aula e nos espaços exteriores. A operação, com um orçamento estimado de 107.210,33 euros + IVA, tem um prazo de execução previsto de 24 meses. (Portuguese)
    0 references
    The operation includes works of the EB1 of Figueira dos Cavaleiros and aims to correct existing deficiencies in the construction and create better conditions for improving the quality of learning, safety and mobility processes. The interventions will focus on improving the conditions of classrooms and outdoor spaces. The operation, with an estimated budget of EUR 107210,33 + VAT, has a planned implementation period of 24 months. (English)
    6 July 2021
    0 references
    Ferreira do Alentejo, Figueira dos Cavaleiros
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000004
    0 references