Increasing the efficiency of the Dviete district heating system (Q3057296)

From EU Knowledge Graph
Revision as of 09:20, 27 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 0.4 percent)
Jump to navigation Jump to search
Project Q3057296 in Latvia
Language Label Description Also known as
English
Increasing the efficiency of the Dviete district heating system
Project Q3057296 in Latvia

    Statements

    0 references
    0 references
    96,177.77 Euro
    0 references
    240,444.44 Euro
    0 references
    14 November 2018
    0 references
    13 May 2021
    0 references
    Sabiedrība ar ierobežotu atbildību "ORNAMENTS"
    0 references
    0 references
    0 references

    57°27'20.63"N, 26°22'17.90"E
    0 references
    Projekta ietvaros paredzēts paaugstināt Dvietes ciema centralizētās siltumapgādes sistēmas un siltumavota efektivitāti un samazināt tā radīto ietekmi uz vidi, izbūvējot jaunu konteinera tipa katlumāju. Projekta rezultātā tiks paaugstināta katlumājas efektivitāte - samazināsies centralizētās siltumapgādes sistēmas uzturēšanas izdevumi, kurināmā patēriņš, elektroenerģijas patēriņš un centralizētās siltumapgādes sistēmas radītā ietekme uz apkārtējo vidi, samazinoties atmosfērā izvadītajam izmešu un emisiju daudzumam. Projekta kopejās izmaksas ir EUR 303 991 no kurām ES finansējums veido EUR 96 177,77. Projektu paredzēts īstenot 30 mēnešu laikā - līdz 2021.gada otrajam ceturksnim. (Latvian)
    0 references
    The project will increase the efficiency of Dviete district heating system and heat source and reduce its environmental impact by constructing a new container boiler house. As a result of the project, the efficiency of the boiler house will be increased – the costs of maintaining the district heating system, fuel consumption, electricity consumption and the environmental impact of the district heating system will be reduced by reducing emissions and emissions into the atmosphere. The total cost of the project is EUR 303 991 of which the EU funding is EUR 96 177.77. The project is planned to be implemented within 30 months – until the second quarter of 2021. (English)
    15 July 2021
    0 references
    Pagasta pārvalde, Dviete, Dvietes pag., Augšdaugavas nov., LV-5441
    0 references

    Identifiers

    4.3.1.0/18/A/033
    0 references