Energy Efficiency Improvement of the Building of Olaine Municipality for the Establishment of a Preschool Education Institution (Q3057149)

From EU Knowledge Graph
Revision as of 09:19, 27 September 2021 by DG Regio (talk | contribs) (‎Removed claim: co-financing rate (P837): 0.21 percent)
Jump to navigation Jump to search
Project Q3057149 in Latvia
Language Label Description Also known as
English
Energy Efficiency Improvement of the Building of Olaine Municipality for the Establishment of a Preschool Education Institution
Project Q3057149 in Latvia

    Statements

    0 references
    244,182.0 Euro
    0 references
    1,136,658.76 Euro
    0 references
    8 May 2019
    0 references
    7 February 2021
    0 references
    Olaines novada pašvaldība
    0 references
    0 references

    56°47'9.35"N, 23°56'3.84"E
    0 references
    Projekta laikā plānots veikt ēkas fasādes siltumizolēšanu, kas ne tikai palielinās energoefektivitāti, bet arī uzlabos pilsētvidi, nodrošinot ēkas iekļaušanos apkārtnē. Ēka atrodas pilsētas centrā - blakus estrādei un Mežaparkam, kas ir iedzīvotāju un novada viesu iecienīta atpūtas vieta. Tāpat projekta laikā tiks veikta pamatu un jumta siltumizolēšana, jumta lūku nomaiņa, logu nomaiņa, kas būtiski uzlabos ēkas mikroklimatu, vienmērīgu temperatūru visās telpās. Tas nodrošinās piemērotu vidi arī pirmskolas vecuma bērniem, kas daudz laika pavada rotaļājoties uz grīdas.Lai turpmāk varētu individuāli regulēt komforta līmeni telpu grupās pēc nepieciešamības, tiks veikta apkures sistēmas pilnīga pārbūve ēkā un mehāniskās ventilācijas izbūve. Visi darbi ir plānoti saskaņā ar ekspertu – energoauditoru ekonomiski pamatotiem energoefektivitāti uzlabojošiem pasākumu ieteikumiem, iekļaujot šos risinājumus būvprojektā.Kopējie plānotie izdevumi ir EUR 1 634 373.69, no tiem ERAF finansējums ir EUR 244 182.00, attiecināmās izmaksas EUR 1 136 658.76, neattiecināmās izmaksas EUR 497 714.93, pašvaldības līdzfinasējums EUR 713 975.87, Valsts budžeta dotācija pašvaldībām EUR 178 500,89 . Papildus plānotajiem renovācijas darbiem, projekta īstenotājs nodrošinās projekta vadību, būvuzraudzību un šādus publicitātes pasākumus:- Lielformāta informatīvais stends -Visu projekta īstenošanas laiku;- Informatīvo plāksni pēc darbu pabeigšanas uz ēkas fasādes;- Informācija internetā - Interneta vietnē olaine.lv tiks publicēts īss apraksts par projektu, tā mērķiem un rezultātiem. Viens raksts - par projekta uzsākšanu, otrs raksts - par sasniegtajiem rezultātiem projekta noslēguma fāzē- 2 raksti. (Latvian)
    0 references
    During the project it is planned to carry out thermal insulation of the facade of the building, which will not only increase energy efficiency, but also improve the urban environment, ensuring the building’s integration into the surrounding area. The building is located in the center of the city – next to the stage and Mežaparks, which is a popular place for residents and guests. During the project, thermal insulation of foundations and roof, replacement of roof hatchways, replacement of windows will be carried out, which will significantly improve the microclimate of the building, even temperature in all rooms. It will also provide a suitable environment for pre-school children, who spend a lot of time playing on the floor.To be able to individually adjust the comfort level in groups of rooms as necessary, complete reconstruction of the heating system in the building and mechanical ventilation will be performed. The total planned expenditure is EUR 1 634 373.69, of which ERDF funding is EUR 244 182.00, eligible costs EUR 1 136 658.76, ineligible costs EUR 497 714.93, municipal co-financing EUR 713 975.87, State budget grant to municipalities EUR 178 500,89. In addition to the planned renovation works, the project implementer will provide project management, construction supervision and the following publicity measures:- Large-scale informative stand – All the time of implementation of the project;- Informative plaque after completion of works on the facade of the building;- Information on the internet – olaine.lv website will publish a short description of the project, its objectives and results. One article – about the start of the project, the other article – about the achieved results in the final phase of the project – 2 articles. (English)
    15 July 2021
    0 references
    Veselības iela 7, Olaine, Olaines nov., LV-2114
    0 references

    Identifiers

    4.2.2.0/17/I/080
    0 references