The construction of a production hall and the purchase of the fixed assets needed to implement innovative technology for the production of novel filtration systems and high-yield transport equipment, key to the increase in the competitiveness of AgrAlex Sp. z o.o. from the trap. (Q137350)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The construction of a production hall and the purchase of the fixed assets needed to implement innovative technology for the production of novel filtration systems and high-yield transport equipment, key to the increase in the competitiveness of AgrAlex Sp. z o.o. from the trap. |
Project in Poland financed by DG Regio |
Statements
4,000,000.0 zloty
0 references
11,070,000.0 zloty
0 references
44.44 percent
0 references
11 May 2017
0 references
31 August 2018
0 references
AGRALEX SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedmiotem projektu jest wdrożenie w firmie Agralex nowej, nieznanej do tej pory w branży obróbki metalu i produkcji urządzeń rolniczych, technologii produkcji systemów filtracji oraz urządzeń transportowych o wydajności pow. 300 t/h. Technologia ta jest wynikiem prac B+R prowadzonych przez zespół badawczy Spółki. Wdrożenie tej technologii do przedsiębiorstwa pozwoli na wprowadzenie na rynek polski oraz zagraniczny dwóch wymienionych wyżej produktów, których konstrukcja będzie idealnie odwzorowywać koncepcję i specyfikację nadaną przez zamawiającego. Obecnie konstrukcje tego typu urządzeń musiały być upraszczane i dostosowywane nie do potrzeb klienta, a do możliwości technicznego ich wykonania. Ponadto, dzięki opracowanej nowej technologii wzrośnie wytrzymałość urządzeń oraz obniży się koszt produkcji. Wprowadzenie na rynek rodzimy i zagraniczny dwóch nowatorskich produktów będzie możliwe dzięki nabyciu niezbędnych środków trwałych (automatyczna linia tnąco–gnąca(1 szt.), linia montażowa wraz z narzędziami montażowymi(1 szt.), regały montażowe(8 szt.), prasa krawędziowa(1 szt.), automat spawalniczy(1szt.) sprężarkownia(1szt.)) oraz budowie hali produkcyjnej(pow. 2.190,51m2), w której zostanie zlokalizowana produkcja. W części montażowej hali zainstalowane zostanie wewnętrzny system suwnic, który pozwoli na transport gotowych elementów konstrukcyjnych z części produkcyjnej do części montażowej. Wdrożenie projektu będzie przebiegało zgodnie z wytycznymi IZ w tym zakresie. W szczególności wybór wykonawców/dostawców będzie przebiegał zgodnie z zasadą konkurencyjności. Powołany zostanie zespół zarządzający inwestycją, którego zadaniem będzie nie tylko prawidłowe dokonywanie zamówień i rozliczenie inwestycji, ale także monitoring wskaźników produktu i rezultatu. Etapy projektu: 1 Wybór wykonawcy hali 2 Budowa hali 3 Wyrób dostawców środków trwałych 4 Zakup, instalacja środków trwałych 5 Zatrudnienie nowych pracowników. (Polish)
0 references
The project involves the implementation of a new, unknown, in the steel industry, to date in the metalworking and agricultural equipment industries, technology for the production of filtration systems and transport equipment with a growing capacity. 300 t/h. this technology is the result of the R & D work carried out by the Company’s research team. The implementation of this technology will allow the company to enter the Polish and foreign markets of the two products mentioned above, the structure of which will be perfectly representative of the concept and specification assigned by the contracting authority. Currently, the structures of this type of equipment have to be simplified and adapted, not to the needs of the customer and to the technical capacity of their execution. In addition, the strength of appliances and the cost of production will increase thanks to the new technology. The introduction into the home and foreign markets of two novel products will be able to be made possible by acquiring the necessary fixed assets (automatic cutting line (1), assembly line with mounting tools (1 heads), mounting pins (8), press brakes (1), welding machines (1 pieces), the compressor station (1 t.)) and the construction of a production hall. 2 190.51 m²) where production will be located. In the assembly part of the assembly, an internal overhead system will be installed which will allow the finished structural parts to be transported from the manufacturing part to the assembly part. The implementation of the project will be carried out in accordance with the MA’s guidelines in this regard. In particular, the selection of contractors/suppliers will be in accordance with the principle of competitiveness. An investment management team will be set up to monitor not only the proper execution of orders and the settlement of investments, but also the monitoring of output and result indicators. Phases of the project: 1 Selection of the contractor of hall 2 Construction of multiarena 3 Selection of suppliers of fixed assets 4 Purchase, installation of fixed assets 5 Employment of new employees. (English)
0 references
Identifiers
RPZP.01.05.00-32-0101/16
0 references