Energy efficiency improvement and repair of multi-apartment residential house in Šaurā iela 26, Daugavpils (Q3057200)

From EU Knowledge Graph
Revision as of 14:08, 10 September 2021 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project Q3057200 in Latvia
Language Label Description Also known as
English
Energy efficiency improvement and repair of multi-apartment residential house in Šaurā iela 26, Daugavpils
Project Q3057200 in Latvia

    Statements

    0 references
    0 references
    500,000.0 Euro
    0 references
    588,235.29 Euro
    0 references
    0.85 percent
    0 references
    7 June 2021
    0 references
    6 December 2022
    0 references
    DAUGAVPILS PILSĒTAS DOME
    0 references
    0 references

    55°53'36.06"N, 26°32'49.81"E
    0 references
    Projekta “Daudzdzīvokļu dzīvojamās mājas energoefektivitātes paaugstināšana un remonts Šaurā ielā 26, Daugavpilī” ietvaros ir paredzēti ēkas energoefektivitātes paaugstināšanas pasākumi un iekštelpu remonts. Projekta mērķis: sekmēt Daugavpils pilsētas pašvaldības ēkas Šaurā ielā 26, energoefektivitātes paaugstināšanu, samazinot primārās enerģijas patēriņu.Projekta galvenās darbības:1. Būvdarbu veikšana pašvaldības ēkā Šaurā ielā 261.1. Ārsienu siltināšana,1.2. Cokola siltināšana,1.3. Jumta stāva, jumta pārseguma siltināšana,1.4. Logu un ārdurvju nomaiņa,1.5. Apkures sistēmas rekonstrukcija,1.6. Apgaismojuma nomaiņa.2. Autoruzraudzība.3. Būvuzraudzība.Projekta publicitātes un būves nodošanas ekspluatācijā izmaksas tiks segtas no pašvaldības budžeta.Plānotais projekta īstenošanas ilgums: 18 mēneši no vienošanās parakstīšanas, no 2021.gada II ceturkņa līdz 2022.gada IV ceturksnim.Darbi tika uzsākti 2018.gada 26.septembrī, kad tika noslēgts līgums par būvniecības dokumentācijas izstrādi daudzdzīvokļudzīvojamās mājas Šaurajā ielā 26, Daugavpilī, energoefektivitātes paaugstināšanai un iekštelpu remontdarbiem.Projekta īstenošana nodrošinās pašvaldības sociālās aprūpes iestāžu pakalpojumu kvalitāti un iestāžu ēkas energoefektivitātes paaugstināšanu, kā arī uzlabos ēkas ārējo izskatu un pilsētvides pievilcību.Projekta kopējās izmaksas: EUR 1 604 190.37, t.sk. ERAF finansējums ir EUR 500 000,00.Projekta plānotie rezultāti:•tiks samazināts primārās enerģijas patēriņš un siltumnīcefekta gāzu emisijas, sekmējot ilgtermiņā energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, •tiks sasniegtas energoefektivitātes prasības atbilstoši Latvijas būvnormatīvā LBN 002-19 “Ēku norobežojošo konstrukciju siltumtehnika”. (Latvian)
    0 references
    Within the framework of the project “Enhancement and repair of energy efficiency of the apartment house at Šaurā iela 26, Daugavpils” the energy efficiency improvement measures of the building and indoor repair are planned. The aim of the project shall be: Promote improvement of energy efficiency of Daugavpils city municipality buildings at Šaurā iela 26, reducing primary energy consumption. Construction works in the municipal building in Šaurā iela 261.1. Insulation of exterior walls,1.2. Cap insulation,1.3. Insulation of roof floor, roof covering,1.4. Replacement of windows and external doors,1.5. Reconstruction of the heating system,1.6. Replacement of illumination.2. Authoritative supervision.3. Construction supervision.The costs of publicity of the project and commissioning of the construction will be covered from the budget of the municipality.The planned duration of the project implementation: 18 months from the signing of the agreement, from fourth quarter of 2021 to IV quarter 2022.Works were started on 26 September 2018, when a contract was signed on the construction documentation development of the apartment apartment house in narrow street 26, Daugavpils, energy efficiency improvement and indoor repair works.The project implementation will ensure the quality of the services of municipal social care institutions and increase the energy efficiency of the building, as well as improve the external appearance of the building and the attractiveness of the urban environment. EUR 1 604 190.37, of which: ERDF funding is EUR 500 000.00.Project’s planned results:•The primary energy consumption and greenhouse gas emissions will be reduced, contributing to the long-term improvement of energy efficiency and reduction of local government expenditure on heating, • the energy efficiency requirements will be achieved in accordance with the Latvian building norm LBN 002-19 “Heat engineering of building envelopes”. (English)
    15 July 2021
    0 references
    Šaurā iela 26, Daugavpils, LV-5410
    0 references

    Identifiers

    4.2.2.0/20/I/025
    0 references