Project Q3056945 in Latvia
Language Label Description Also known as
English
Measures to improve the energy efficiency of the VVD Liepaja RVP building
Project Q3056945 in Latvia

    Statements

    0 references
    0 references
    126,439.2 Euro
    0 references
    148,752.0 Euro
    0 references
    0.85 percent
    0 references
    18 March 2019
    0 references
    17 December 2019
    0 references
    Valsts vides dienests
    0 references
    0 references

    56°30'49.28"N, 21°1'5.63"E
    0 references
    Projekta “VVD Liepājas RPV ēkas energoefektivitātes paaugstināšanas pasākumi” (turpmāk-Projekts) mērķis ir, saskaņā ar Ministru kabineta 2016.gada 9.augusta noteikumiem Nr.534 “Darbības programmas “Izaugsme un nodarbinātība” 4.2.1. specifiskā atbalsta mērķa “Veicināt energoefektivitātes paaugstināšanu valsts un dzīvojamās ēkās” 4.2.1.2. pasākuma “Veicināt energoefektivitātes paaugstināšanu valsts ēkās” pirmās projektu iesniegumu atlases kārtas īstenošanas noteikumi” (turpmāk – MK noteikumi Nr.534), veicināt Valsts vides dienesta (turpmāk- VVD) pārvaldībā esošās ēkas Jaunā ostmala 2A, Liepājā energoefektivitātes paaugstināšanu. Lai sasniegtu Projektā izvirzīto mērķi, ir paredzēts veikt ēku norobežojošo konstrukciju siltināšanas pasākumus, kas būtiski uzlabos ēkas siltumnoturību kopumā. Plānotās energoefektivitātes rādītāju sasniegšanai tiks veikti ēkas pirmā stāva grīdas siltināšanas, ārsienu siltumizolēšanas, ēkas cokola daļas siltumizolēšanas, bēniņu siltināšanas un jumta hidroizolācijas spēju atjaunošanas darbi,siltummezgla uzlabošana. Tiks veikta ārdurvju nomaiņa. Lai nodrošinātu Projekta mērķa sasniegšanu un uzraudzītu veikto darbu kvalitāti, tiks veikta objekta būvuzraudzība un autoruzraudzība.Papildus galvenajām darbībām tiks nodrošināti publicitātes pasākumi.Projekta ilgums ir 9 mēneši no vienošanās par projekta īstenošanas noslēgšanas brīža . Siltināšanas pasākumus- būvdarbus plānots uzsākt 2019.gada III ceturksnī un pabeigt līdz 2019.gada IV ceturkšņa beigām.Projekta kopējās izmaksas 182 681,80 EUR, no tām Projekta kopējās attiecināmās izmaksas ir 148 752,00 EUR un 33 929,80 EUR ir Projekta tiešās neattiecināmās izmaksas, kuras VVD segs no sava pamatbudžeta Projekts tiks īstenots piesaistot publisko finansējumu, tajā skaitā Eiropas Reģionālās attīstības fonda finansējumu – 85% jeb 126 439,20 EUR apmērā un valsts budžeta finansējumu- 15% jeb 22 312,80 EUR apmērā.Realizējot Projektu tiek plānots:-siltumenerģijas gada patēriņa samazinājums- 44,99 MWh;- siltumenerģijas patēriņš apkurei pēc Projekta īstenošanas, pamatojoties uz ēkas energosertifikātā veiktajiem aprēķiniem un projekta tehniskajā dokumentācija paredzētajiem būvdarbiem- 50,39 kWh/m2;-aprēķinātais siltumnīcefekta gāzu samazinājums- 9,089 CO2 ekvivalenta tonnas gadā;-publiskā finansējuma apmērs attiecināmajām izmaksām uz vienu ēkas kopējās platības kvadrātmetru- 248,38 EUR. (Latvian)
    0 references
    The aim of the project "Energy Efficiency Improvement Measures of the VVD Liepaja RPV Building" (hereafter-Project) is according to the Cabinet of Ministers Regulation of 9 August 2016 No 534 "Regulations of the first round of project applications of the Operational Programme "Growth and Employment" "Promoting energy efficiency improvement in state and residential buildings" 4.2.1.2 "Promoting the improvement of energy efficiency in public buildings" (hereafter – Cabinet Regulations No.534), to promote the improvement of the State Energy Service in the State Energy Service (hereafter – Cabinet Regulations No.534). In order to achieve the project’s objective, it is planned to carry out insulation measures of the building envelope, which will significantly improve the thermal stability of the building as a whole. To achieve the planned energy efficiency indicators, insulation of the building’s first floor floor, insulation of exterior walls, insulation of the base part of the building, insulation of attic and waterproofing capacity of the roof will be carried out, improvement of the heating unit. Replacement of external doors will be carried out. In order to ensure the achievement of the Project goal and to monitor the quality of the works, construction supervision and author supervision of the project will be carried out.In addition to the main activities, publicity measures will be provided.The duration of the project is 9 months from the conclusion of the project implementation. The total cost of the project is EUR 182681,80, of which the total eligible costs of the project are EUR 148752,00 and EUR 33929,80 are the project’s direct ineligible costs, which will be covered by the VVD from its core budget The project will be implemented by attracting public funding, including the European Regional Development Fund financing EUR 85,80 and the public budget funding to the public budget The project will be allocated to the total area of the building, to calculate the energy-good for the year, the energy consumption reduction of the project is planned: 50 % for heating, or EUR 126439,20 for the public budget, or at EUR 22312,80 for the total area of the building. (English)
    15 July 2021
    0 references
    Jaunā ostmala 2A, Liepāja, LV-3401
    0 references

    Identifiers

    4.2.1.2/18/I/015
    0 references