No label defined (Q3057015)
Jump to navigation
Jump to search
Project Q3057015 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3057015 in Latvia |
Statements
237,730.48 Euro
0 references
279,682.92 Euro
0 references
14 August 2018
0 references
13 August 2019
0 references
Profesionālās izglītības kompetences centrs "Rīgas Valsts tehnikums"
0 references
Projekta mērķis ir Profesionālās izglītības kompetences centra "Rīgas Valsts tehnikums" ēkas Ūnijas ielā 31A, Rīgā energoefektivitātes paaugstināšana, nodrošinot ēkas fasāžu siltumtehnisko rādītāju uzlabošanos, samazinot ēkas siltuma zudumus caur tās norobežojošām konstrukcijām, veicot pilnu apkures sistēmas rekonstrukciju, palielinot ēkas nesošo konstrukciju ilgmūžību un ēkas ekspluatācijas laiku, vienlaicīgi uzlabojot ēkas vizuālo izskatu. Projekta ietvaros plānotās darbības ir tieši vērstas uz šī mērķa izpildi, veicot ēkas nesiltināto fasāžu renovāciju atbilstoši izstrādātajam būvprojektam, ēkas energosertifikātam un ēkas tehniskās apsekošanas atzinumam. Projekts tiek īstenots saskaņā ar PIKC "RVT" Attīstības un investīciju stratēģiju 2015. – 2020.gadam. Lai nodrošinātu 2016.gada 9.augusta Ministru kabineta noteikumos Nr.534 „Darbības programmas "Izaugsme un nodarbinātība" 4.2.1. specifiskā atbalsta mērķa "Veicināt energoefektivitātes paaugstināšanu valsts un dzīvojamās ēkās" 4.2.1.2. pasākuma "Veicināt energoefektivitātes paaugstināšanu valsts ēkās" pirmās projektu iesniegumu atlases kārtas īstenošanas noteikumi” noteiktā specifiskā mērķa sasniegšanu, PIKC "RVT" plāno veikt šādus būvdarbus: 1. ēkas sienu siltināšana ar siltumizolāciju 150mm biezumā;2. cokola sienu siltināšana ar siltumizolāciju 100mm biezumā, nomainot pagraba logus;3. bēniņu pārseguma siltināšana ar siltumizolāciju 300mm biezumā;4. pagraba griestu siltināšana ar siltumizolāciju 100mm biezumā; 5. veco ārdurvju maiņa pret jauniem alumīnija durvju blokiem, visas durvju ailas siltinot ar siltumizolāciju 30mm biezumā, un izveidojot vējtverus; 6. Apkures sistēmas rekonstrukcija, uzstādot jaunus radiatorus un termoregulatorus; 7. Siltummezgla izbūve ar plākšņu siltummaini.Projekta īstenošanas vieta - Rīga (Rīgas plānošanas reģions). Projekta īstenošanas ilgums – no 2018.gada augusta līdz 2019.gada augustam (kopā 12 mēneši). Projekta kopējās izmaksas – EUR 282 126,00, tai skaitā Eiropas Reģionālās attīstības fonda finansējums – EUR 239 807,10 un valsts budžeta līdzfinansējums – EUR 42 318,90. Balstoties uz projektā paredzētajām darbībām, projekta īstenošana nodrošinās PIKC "RVT" ēkas energoefektivitātes paaugstināšanu, nodrošinot ēkas fasāžu siltumtehnisko rādītāju uzlabošanos, samazinot ēkas siltuma zudumus caur tās norobežojošām konstrukcijām, palielinot ēkas nesošo konstrukciju ilgmūžību un ēkas ekspluatācijas laiku, vienlaicīgi uzlabojot ēkas vizuālo izskatu. Projekta īstenošana nodrošinās, ka tiks sasniegti šādi rezultāti: 1)siltumenerģijas ietaupījums pēc projekta īstenošanas būs ne mazāks kā 30% gadā no ēkas energosertifikātā aprēķinātā siltumenerģijas patēriņa pirms projekta īstenošanas; 2)siltumenerģijas patēriņš apkurei pēc projekta īstenošanas, pamatojoties uz ēkas energosertifikātā veiktajiem aprēķiniem un projekta tehniskajā dokumentācijā paredzētajiem būvdarbiem nepārsniegs 90 kWh/m2 gadā; 3) primārās enerģijas gada patēriņa samazinājums - 139,15 MWh/gadā; 4) aprēķinātais siltumnīcefekta gāzu samazinājums - 28,26 CO2 ekvivalenta tonnas gadā. (Latvian)
0 references
The aim of the project is to increase the energy efficiency of the Vocational Education Competence Centre “Riga State Technical School” building at Unijas Street 31A, Riga, ensuring improvement of thermal performance of the building facades, reducing heat losses of the building through delimiting structures, carrying out a full reconstruction of the heating system, increasing the longevity of the building’s bearing structures and the life of the building, at the same time improving the visual appearance of the building. The activities planned within the framework of the project are directly aimed at the fulfilment of this objective by renovating the uninsulated facades of the building in accordance with the elaborated construction project, the energy certificate of the building and the technical inspection of the building. The project is being implemented in accordance with RVT Development and Investment Strategy 2015. The year 2020. In order to ensure achievement of the specific objective defined by the Cabinet of Ministers Regulations No 534 of 9 August 2016 "Regulations for the Implementation of the First Project Application Series of the Operational Programme "Growth and Employment" Specific Support Objective 4.2.1 "Promoting energy efficiency improvement in public buildings" 4.2.1.2 "Promoting energy efficiency improvement in public buildings" the SICC "RVT" plans to carry out the following construction works: 1. insulation of walls of the building with heat insulation of 150 mm thickness; insulation of the walls of cap 2 with insulation of 100 mm thickness, replacing basement windows;3. insulation of the attic cover with heat insulation of 300 mm thickness;4. basement ceiling insulation with insulation of 100 mm thickness; .5 replacement of old exterior doors against new aluminium door blocks by insulating all door openings with a thickness of 30 mm and creating wind traps; 6. Reconstruction of the heating system by installing new radiators and thermal regulators; 7. Construction of a heating unit with heat exchanger plate. Project location – Riga (Riga planning region). Project implementation duration – from August 2018 to August 2019 (12 months in total). Total cost of the project – EUR 282 126.00, including European Regional Development Fund funding – EUR 239 807.10 and state budget co-financing – EUR 42 318.90. Based on the activities envisaged in the project, the implementation of the project will ensure improvement of the energy efficiency of the RVT building, ensuring improvement of the thermal performance of the building facades, reducing heat losses of the building through its enclosing structures, increasing the longevity of the building and the life of the building while improving the visual appearance of the building. The implementation of the project will ensure that the following results will be achieved: 1) Heat energy savings after project implementation will be no less than 30 % of the annual thermal energy consumption calculated in the energy certificate of the building prior to implementation of the project; 2) the heat consumption for heating after implementation of the project, on the basis of the calculations made in the energy certificate of the building and for the works envisaged in the technical design documentation, will not exceed 90 kWh/m² per year; 3. reduction in annual primary energy consumption: 139,15 MWh/year; 4) Estimated greenhouse gas reduction of 28.26 tonnes of CO2 equivalent per year. (English)
15 July 2021
0 references
Ūnijas iela 31A, Rīga, LV-1039
0 references
Identifiers
4.2.1.2/17/I/059
0 references